Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Ceigall India Strengthens Infrastructure Portfolio with Appointed Dates for Three HAM Projects Valued at ₹4,050 Crore

Highway project under Hybrid Annuity Mode (HAM) includes: ₹1,656 crore Varanasi-Ranchi-Kolkata Highway Package 11 ₹1,305 crore Varanasi-Ranchi-Kolkata Highway Package 12 ₹1,089 crore Indore-Ujjain Greenfield Highway

Palak by Palak
July 8, 2026
in News
Reading Time: 2 mins read
0
Ceigall India
Share on FacebookShare on TwitterShare on Linkedin

New Delhi : Ceigall India Limited has achieved a significant execution milestone after receiving the Appointed Date for three strategic highway projects with a combined value of ₹4,050 crore. The milestone enables the commencement of construction across key road infrastructure projects in Jharkhand and Madhya Pradesh, further strengthening the Company’s execution pipeline and reinforcing its position as a leading partner in India’s infrastructure development.

The Appointed Date of July 6, 2026 has been declared for all three projects by the respective project authorities, paving the way for construction activities to begin.

RELATED POSTS

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

The projects include:

  • Varanasi-Ranchi-Kolkata Greenfield Highway (Package 11) – Construction of a six-lane access-controlled Greenfield highway from Donoreshan village to Bongabar village in Jharkhand under the Bharatmala Pariyojana on Hybrid Annuity Mode (HAM), with a project value of ₹1,656 crore.
  • Varanasi-Ranchi-Kolkata Greenfield Highway (Package 12) – Construction of a six-lane Greenfield highway from Bongabar village to Lepo village in Jharkhand under the Bharatmala Pariyojana on Hybrid Annuity Mode (HAM), with a project value of ₹1,305 crore.
  • Indore-Ujjain Greenfield Highway – Construction of a four-lane access-controlled Greenfield highway connecting Indore and Ujjain in Madhya Pradesh under Hybrid Annuity Mode (HAM), with a project value of ₹1,089 crore.

Together, the three projects represent a significant addition to Ceigall India’s execution portfolio and underscore the Company’s continued momentum in delivering complex road infrastructure projects across the country. The two Jharkhand packages form part of the Varanasi-Ranchi-Kolkata Greenfield Corridor under the Bharatmala Pariyojana, while the Indore-Ujjain project is expected to strengthen regional connectivity and improve travel efficiency in Madhya Pradesh.

Commenting on the development, Mr. Ramneek Sehgal, Chairman & Managing Director, Ceigall India Limited, said:

“The declaration of the Appointed Date for these three projects marks another important milestone in our growth journey and reinforces the confidence that project authorities continue to place in Ceigall India’s execution capabilities. These project wins further strengthen our order book and provide strong visibility for sustained growth as we continue to deliver high-quality infrastructure across the country. As India accelerates investments in world-class transport infrastructure, we remain committed to executing projects that improve connectivity, support economic development, and contribute meaningfully towards the nation’s vision of a Viksit Bharat by 2047. Our focus remains on timely execution, engineering excellence, and creating infrastructure that serves generations to come.”

With construction now set to commence, Ceigall India continues to strengthen its portfolio of highway projects while contributing to India’s expanding multimodal infrastructure network through timely execution and best-in-class engineering capabilities.

Tags: Ceigall IndiaHAM
ShareTweetShare
Palak

Palak

Related Posts

BL Agro

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

by Urja Daily
October 23, 2026
0

New Delhi/Bareilly : BL Agro announced its entry into the global market with a strategic investment of ₹7000 crore in...

Solar wind

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

by Urja Daily
October 23, 2026
0

According to latest research by Growth Market Reports, the Transformerless Solar Central Inverter market size reached USD 4.1 billion in...

Yash Highvoltage

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

by Urja Daily
October 22, 2026
0

Vadodara : Yash Highvoltage Limited a leading manufacturer of condenser-graded high voltage and high current transformer bushings, has announced its unaudited...

Comau

Comau Partners with NVIDIA to Advance Physical AI in Industrial Robotics

by Urja Daily
October 21, 2026
0

Comau is integrating NVIDIA Physical AI simulation libraries and accelerated computing into its products and system design processes to accelerate...

EcoCortec

EcoCortec® Lab Earns Prestigious ISO/IEC 17025 Accreditation, Solidifying Global Trust in VpCI® Quality

by Urja Daily
October 21, 2026
0

EcoCortec has been granted HRN EN ISO/IEC 17025:2017 accreditation. Effective October 5th for a five-year period, the EcoCortec® Testing Laboratory...

Next Post
Dr. Alok Sharma

Gruner Renewable Energy Appoints Former Indian Oil Corporation Limited Director (R&D) to Strengthen Leadership

Solar

Hartek Power Bags Order for 400 MW Solar Project in Rajasthan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved