Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

CEA Releases Draft Guidelines for Real-Time Weather Monitoring at Renewable Energy Sites

Palak by Palak
July 10, 2025
in Renewable
Reading Time: 1 min read
0
Central Electricity Authority
Share on FacebookShare on TwitterShare on Linkedin

The Central Electricity Authority (CEA) has issued guidelines for the installation of automatic weather stations (AWS) at renewable energy project sites to enhance generation forecasting, weather predictability, and grid reliability. 

As per the draft, AWS must be installed at solar and wind project sites of 50 MW or more, or as specified by the respective State Electricity Regulatory Commission. The Central Electricity Regulatory Commission will govern capacity regulations for both intra-state and inter-state transmission system connected projects. For solar projects, the AWS must be located on terrain resembling the plant site, with irradiance sensors aligned in the same tilt and orientation as the modules. 

RELATED POSTS

Energy Veteran Dinesh Sarraf Joins Gruner Renewable Energy as Chief Advisor

GPS Renewables raises ₹635 crore in Series C Funding

For wind projects, the station must reflect the actual wind regime, including turbulence zones and artificial barriers. The AWS must support real-time data transmission at 15-minute intervals, adjustable to one-minute intervals during extreme weather. It should be capable of unattended operation under all weather conditions, powered by a sealed maintenance-free battery with a minimum 20-day backup, and recharged through solar panels.

Tags: Central Electricity AuthorityElectricityRenewable Energysolar
ShareTweetShare
Palak

Palak

Related Posts

Dinesh Sarraf, Chief Advisor, Gruner Renewable Energy

Energy Veteran Dinesh Sarraf Joins Gruner Renewable Energy as Chief Advisor

by Palak
June 10, 2026
0

Noida, India : Gruner Renewable Energy, the flagship company of the Gruner Group and one of India's fastest-growing EPC companies...

GPS Renewables

GPS Renewables raises ₹635 crore in Series C Funding

by Palak
June 8, 2026
0

Bengaluru : GPS Renewables (GPSR) has raised ₹635 crore in Series C Funding. The Series C round comprises ₹125 crore in...

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

by Palak
June 3, 2026
0

New Delhi : Joint Solar is expanding its manufacturing of TOPCon and higher-efficiency solar modules. In view of the growing demand...

Servotech x HEPC

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

by Palak
June 2, 2026
0

New Delhi - Servotech Renewable Power System Ltd. has signed a Memorandum of Understanding (MoU) with the Haryana Enterprises Promotion...

Servotech Power Systems

Servotech Launches Solar Campaign Featuring Sonu Sood

by Palak
June 2, 2026
0

New Delhi : Servotech Renewable Power System Ltd. has launched its new Solar TVC ad campaign, ‘Raho Roshan, Bina Tension’,...

Next Post
Comau

Comau and Intecells partner to innovate battery electrode manufacturing for a sustainable future

INOX Clean Energy

INOX Clean Energy Submits DRHP to SEBI for Upcoming IPO

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

GAP First Co-Working Space

GAP Group Launches Dholera’s First Co-Working Space to Boost India’s Semiconductor Ecosystem

June 12, 2026
Kishan Karunakaran, CEO of Buyofuel

How Biofuel Startups Are Reimagining Waste Management in India

June 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

GAP Group Launches Dholera’s First Co-Working Space to Boost India’s Semiconductor Ecosystem

How Biofuel Startups Are Reimagining Waste Management in India

91Wheels, Mahindra Electric Complete India–Bhutan EV Journey

Why Is the Microneedling Devices Market Experiencing Rapid Growth Worldwide?

From Diesel to Data: How Smart Tractors Are Redefining Indian Agriculture

153 elevators and escalators delivered for the New Taipei Metro Sanying Line in Taiwan

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved