Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

BrightNight and Cordelio Power Sign PPA with Arizona Public Service

Urja Daily by Urja Daily
February 10, 2025
in Power
Reading Time: 1 min read
0
BrightNight
Share on FacebookShare on TwitterShare on Linkedin

BrightNight and Cordelio Power have inked a power purchase agreement (PPA) with Arizona Public Service (APS). Under this agreement, APS will procure carbon-free energy from BrightNight and Cordelio’s clean energy center. This is a hybrid facility featuring 300 MW of solar capacity and 1,200 MWh of battery energy storage.

Construction of the project is expected to commence in September 2025, with operations commencing in April 2027. The facility will deliver reliable, affordable, and clean electricity to APS customers, support the region’s growing energy needs, and enhance grid resilience. 

RELATED POSTS

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

Earlier in November 2024, EDF Renewables North America secured a 20-year Energy Storage PPA with APS for the Beehive Battery Energy Storage System (BESS) located in Peoria, Maricopa County, Arizona. This stand-alone battery system features a 250 MW capacity with a four-hour duration. The project is slated to begin construction in 2025.

Tags: ArizonaBESSBrightNightClean Energypower
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

NEEPCO

NEEPCO signs PPA with GUVNL for 164.4 MW power allocation

by Urja Daily
October 30, 2026
0

North Eastern Electric Power Corporation Limited (NEEPCO) has signed a power purchase agreement (PPA) with Gujarat Urja Vikas Nigam Limited...

Electricity

MoP releases National Electricity Data Sharing Framework 2026

by Urja Daily
October 30, 2026
0

The Ministry of Power has released the National Electricity Data Sharing Framework 2026 to establish common practices for sharing operational,...

NLC India

NLC India Signs MoUs with IPICOL to Develop Power and Industrial Projects in Odisha

by Urja Daily
October 27, 2026
0

NLC India Limited (NLCIL) has signed memoranda of understanding with the Industrial Promotion and Investment Corporation of Odisha Limited (IPICOL)...

Next Post
Matrix Renewables

Matrix Renewables Secures €40M for Six Solar Plants in Italy

Sulgas 2025

WIKA India Showcased Innovative Solutions at SulGas 2025 in Mumbai

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved