Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Boralex Inks Deals to Develop 450 MW of Solar Capacity in the U.S.

Palak by Palak
May 27, 2025
in Solar
Reading Time: 1 min read
0
Boralex
Share on FacebookShare on TwitterShare on Linkedin

Boralex has entered into a renewable energy standard agreement with the New York State Energy Research and Development Authority (NYSERDA). Under this agreement, Boralex will procure Tier-1 renewable energy certificates (RECs) from its 250 MW Fort Covington solar project and 200 MW Two Rivers solar project. The projects have a total capacity of 450 MW.

The contracts were provided as part of NYSERDA’s 2024 Renewable Energy Standard Competitive Solicitation for the purchase of New York Tier-1 Eligible RECs. The solar projects are situated in New York. Construction on the project is expected to commence in 2026, with commissioning scheduled for 2028.

RELATED POSTS

SAEL bags solar module supply order from NTPC REL

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

Boralex is a renewable energy production company with projects in Canada, France, UK, and US. The company currently has renewable energy projects with an installed capacity of 3.1 GW and has 8 GW projects in development and construction. 

Earlier in April 2025, Boralex’s Limekiln wind farm and all its turbines became operational. The wind farm is located near Thurso in Caithness and has an installed capacity of 106 MW. It consists of 24 Vestas V136-4.5 MW wind turbines, measuring 150m to the tip of the blade.

Tags: BoralexNYSERDARenewable Energysolarwind farm
ShareTweetShare
Palak

Palak

Related Posts

SAEL

SAEL bags solar module supply order from NTPC REL

by Palak
July 14, 2026
0

SAEL Solar P6 Private Limited, a subsidiary of SAEL Industries Limited, has secured a letter of award from NTPC Renewable...

Sunsure Energy

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

by Palak
July 9, 2026
0

Sunsure Energy has secured Rs 2.62 billion debt financing from FMO, the Dutch entrepreneurial development bank, and Axis Bank for...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Jupiter International Limited

Jupiter International Limited Secures ₹1.08 Billion Solar Pumps Order from Maharashtra State Electricity Distribution Company Limited

by Palak
July 9, 2026
0

Jupiter International Limited has received a Letter of Empanelment (LoE) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL). The...

Solar

Hartek Power Bags Order for 400 MW Solar Project in Rajasthan

by Palak
July 9, 2026
0

Hartek Power has secured a 400 MW utility-scale solar engineering, procurement, and construction (EPC) project in Rajasthan. The project will...

Next Post
Ravi Kumar, VP Sales, Oorjan Cleantech

The Solar Surge: How Cutting-Edge Technologies Are Powering the Next Energy Revolution

The Rajasthan Electricity Regulatory Commission (RERC)

Rajasthan Rolls Out 2025 Regulations for Green Energy Open Access

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved