Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home E-Mobility

ADS-TEC Energy Announced that Energie Steiermark Deployed Ultra-Fast EV Charging Stations

Urja Daily by Urja Daily
February 4, 2022
in E-Mobility
Reading Time: 3 mins read
0
adstec
Share on FacebookShare on TwitterShare on Linkedin
  • Ultra-fast charging station in use at Energie Steiermark’s headquarters in Graz, Austria, since May 2021; company plans to expand the region’s fast-charging infrastructure more broadly

NÜRTINGEN, Germany- ADS-TEC Energy today announced that Energie Steiermark, one of the largest energy companies in Austria, has deployed ultra-fast electric vehicle (EV) charging stations from ADS-TEC Energy.

Reaffirming its commitment to e-mobility, Energie Steiermark has installed two ultra-fast charging points directly in front of the main entrance of its corporate headquarters in Graz, Austria. The ADS-TEC Energy system charges the EVs of customers, visitors and employees up to 320 kilowatts in a matter of minutes. The installation was affordable, did not require securing permits or approvals, and uses existing power grids.

RELATED POSTS

New Battery-Operated Bluetooth® Controller Enables Truly Mobile, Plug-and-Play Access

Toray Develops High-Performance Anode Film for Lithium-Ion Batteries

With its dense network of charging stations, the Austrian province of Styria is considered one of the showcase regions for e-mobility in Europe. Energie Steiermark, which provides energy and services throughout Austria and internationally, is planning to expand the region’s fast-charging infrastructure by deploying ADS-TEC Energy’s battery-buffered technology more broadly. Depending on the vehicle, the ADS-TEC Energy chargers deliver capacities of up to 320 kilowatts, with quieter operation than conventional systems. This enables electric cars with modern 800-volt technology to be charged in minutes in residential areas, without the driver having to travel long distances to the charging parks located on major highways.

After being installed in front of the Energie Steiermark headquarters last May, the two green, futuristically-styled charging columns quickly became extremely popular among customers, visitors and employees, who use the service to charge their vehicles even after short meetings or visits.

Energie Steiermark is currently determining additional locations for installing ultra-fast charging stations in the region, a process which is easier and less costly than other options; it does not require investment in power grid expansion and can be set up and installed within a few days without requiring time-consuming construction of medium-voltage systems and transformer stations. It also does not require securing building permits, approval procedures and ongoing fees that would otherwise be necessary with other charging technologies.

The product enabling the rapid deployment of ultra-fast charging stations in power-limited grids is the ADS-TEC Energy ChargeBox, which incorporates a battery storage system that continuously charges itself slowly to release maximum charging power when needed. The available connection line from the grid is used directly for the charging process – in Graz it is 50 kilowatts — and the energy is then stored in the ChargeBox battery. This approach ensures that there is always enough energy and power available, even for many charging cycles in a row.

The ChargeBox and individual charging stations can be installed directly next to each other – as is the case in front of Energie Steiermark’s company headquarters – or also at a significant distance of up to 329 feet (100 meters). Compared to systems requiring a dedicated grid extension, ADS-TEC Energy’s battery-buffered fast-charging solution is typically much more cost-effective. It also takes up significantly less space. This makes development in urban locations much easier. In terms of its capacity and performance, ADS-TEC Energy is the world leader of this small design. All the necessary technology, such as the battery unit with 140 kilowatt hours, power electronics, air conditioning and control system, is housed in a footprint of less than 16 square feet (1.5 square meters). The system operates noiselessly even in maximum operation and is therefore well suited for use in residential areas and next to multi-apartment buildings.

Christian Purrer, Energie Steiermark board spokesman, said: “The expansion of the infrastructure of e-charging stations is key to the successful deployment of electromobility. With the ultra-fast charging station from ADS-TEC Energy, we can easily charge electric cars with up to 320 kilowatts within a few minutes, if necessary. The charging station installed in front of our headquarters sets a new standard in terms of convenient and flexible use of electrically-powered vehicles. Thanks to our consistent expansion of the charging infrastructure, today no household in Styria is further than one mile (15 kilometers) from the nearest e-charging station.”

Martin Dreyer, Sales Manager at ADS-TEC Energy, added: “Energie Steiermark is considered one of the pioneers of e-mobility in Europe. With the installation of our ultra-fast charging station directly in front of the company headquarters, the company has set an example that has already attracted a great deal of attention in the industry in Europe and the USA. We look forward to working with Energie Steiermark to further advance the region’s lead in climate protection and e-mobility.”

More information on www.adstec-energy.com

Tags: ADS-TEC EnergyEnergie Steiermark
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Southco

New Battery-Operated Bluetooth® Controller Enables Truly Mobile, Plug-and-Play Access

by Palak
July 31, 2026
0

HONG KONG SAR - Power limitations, tight spaces, and complex security setups have traditionally made Bluetooth® access hardware difficult to...

Toray Industries

Toray Develops High-Performance Anode Film for Lithium-Ion Batteries

by Palak
July 30, 2026
0

Tokyo – Toray Industries that it has developed the world’s first film for anode current collectors that meets all four...

Tunwal E-Motors

Tunwal E-Motors Accelerates Nationwide Expansion, Targets 1,000+ Dealer Network by FY27

by Palak
June 29, 2026
0

Pune: Tunwal E-Motors Limited a publicly listed electric mobility company specializing in electric bikes, has announced plans to expand its dealership...

Introducing the Kvaser PCIe 4xLIN for next-level LIN connectivity

by Palak
June 29, 2026
0

Mölndal, Sweden - Kvaser introduces the PCIe 4xLIN, a compact four-channel LIN interface built for deterministic communication, precise timing analysis,...

EV Charging

Servotech Secures BEE 5-star Rating for 60 kW & 120 kW DC EV Chargers

by Palak
June 25, 2026
0

New Delhi : Servotech Renewable Power System Ltd. secured the 5-Star rating from the Bureau of Energy Efficiency (BEE) for...

Next Post
Smart Cities

Smart Cities Pivot to Hydrogen and Other Priorities: IDTechEx

IoT Solutions Market

IoT Solutions Market for Energy Industry Pave Way to Smarter, More Resilient Grids

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved