Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

ACWA Power inks PPA for 2 GW wind project in Egypt

Palak by Palak
February 20, 2025
in Wind
Reading Time: 1 min read
0
ACWA Power
Share on FacebookShare on TwitterShare on Linkedin

ACWA Power has inked a 25-year power purchase agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for a 2 GW wind project in Egypt. The investment in the project is approximately $2.3 billion. The project is expected to reach financial close in 2026.

Furthermore, this wind project will support the Egyptian government in increasing the share of renewable energy in its electricity generation mix to 42 per cent by 2030. It is also expected to reduce carbon emissions by over 3.5 million tonnes annually.

RELATED POSTS

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

In January 2025, ACWA Power and HAU Energy achieved financial close for the 1.1 GW Suez Wind Farm in Egypt. This project secured a $ 703.6 million senior debt facility from a consortium of banks. The project is situated in the Gulf of Suez and Gabal El-Zeit area and involves a total investment of $1.2 billion. ACWA Power holds a 70 per cent share in the project, while HAU Energy owns the remaining 30 per cent.

Tags: ACWA Powercarbon emissionElectricitypowerWind
ShareTweetShare
Palak

Palak

Related Posts

GUVNL

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

by Palak
July 13, 2026
0

Gujarat Urja Vikas Nigam Limited (GUVNL) has announced the winners of its auction to procure power from 250 MW of...

Delta Electronics India

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

by Palak
July 11, 2026
0

India's wind sector is crossing a meaningful manufacturing milestone. For years, much of the critical equipment inside turbines—especially converters that...

NTPC

NTPC Green Energy Limited Commissions 50.4 MW Vanki Wind Project in Gujarat

by Palak
July 10, 2026
0

NTPC Green Energy Limited (NGEL) has declared the commercial operation of the first part capacity of 50.4 MW of the...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Tata Power

Tata Power Commissions 100.8 MW Wind Project

by Palak
July 6, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power Company Limited, has commissioned its 100.8 MW Jewali wind...

Next Post
KBR

KBR to Conduct Feasibility Study for Green Fuels Terminal in Portugal

ASDC

ASDC Partners with Steinbeis University for 1+1 Master’s Program

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved