Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

Central Electricity Regulatory Commission Introduces One-Time GNA Relaxation for Renewable Energy Projects

Palak by Palak
July 16, 2026
in Renewable
Reading Time: 2 mins read
0
CERC
Share on FacebookShare on TwitterShare on Linkedin

The Central Electricity Regulatory Commission (CERC) has approved a one-time General Network Access (GNA) relaxation for renewable energy projects with letters of award (LoAs) issued between January 2019 and May 2025. The measure is aimed at enabling the utilisation of nearly 22 GW of blocked interstate transmission system (ISTS) renewable capacity for which power purchase agreements (PPAs) have not been signed, of which around 6.35 GW is affected by transmission planning issues. Additionally, renewable energy implementing agencies (REIAs) have informed that PPAs for 2,490 MW may be signed, with discussions currently underway. 

Furthermore, the relaxation provides eligible developers with four one-time options: exit state-backed LoA with loosing grid connectivity and move forward as merchant or independently contracted projects, replace the stalled LoA with an active PPA linked to another project LoA, surrender the GNA if the project is no longer being pursued, or continue under the existing GNA regulations, subject to applicable regulatory requirements, including penalties and cancellation if project deadlines are not met.

RELATED POSTS

Grew Solar Partners with Caelux, USA To Accelerate Next-Generation Solar Technology

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

The first option allows developers to exit the LoA route without surrendering connectivity, subject to obtaining a no objection certificate (NOC) from the concerned REIA, furnishing a performance bank guarantee of Rs 0.8 million per MW, and committing to a revised scheduled commercial operation date (SCOD) within 24 months. The second option permits developers to substitute the original LoA with a PPA secured under another LoA, with the revised SCOD capped at 30 months from the date of conversion, while also allowing partial capacity conversions and multi-location renewable energy projects.

The third option enables developers to voluntarily surrender full or partial connectivity, with an NOC from the concerted REIA that had issued the LoA certifying the non-signing of the PPA, following which the Central Transmission Utility of India Limited will reallocate the released transmission capacity within the same substation cluster before auctioning any remaining capacity. Under the fourth option, developers may continue under the existing GNA Regulations, with projects automatically remaining under the existing framework if no option is exercised within the prescribed timeline.

Tags: CERCISTSRenewable Energy
ShareTweetShare
Palak

Palak

Related Posts

Grew Solar

Grew Solar Partners with Caelux, USA To Accelerate Next-Generation Solar Technology

by Urja Daily
September 16, 2026
0

Mumbai/Ahmedabad : GREW Solar, one of India's fastest-growing solar manufacturers, and Caelux Corporation (Caelux), a global leader in perovskite solar technology, today announced a 4 Gigawatt (GW), five-year commercialization partnership to produce high-power Hybrid-TandemTM solar modules with Caelux’s Energy...

Grew Solar

GREW Solar Strengthens West India Presence with New Distribution Partnership with Indogreen Infra LLP

by Urja Daily
September 12, 2026
0

Ahmedabad: GREW Solar, one of India’s fastest-growing solar PV manufacturers, today announced a new channel partnership with Indogreen Infra LLP, Ahmedabad,...

MNRE

MNRE Calls for Proposals to Advance Concentrating Solar Thermal Technology

by Urja Daily
September 10, 2026
0

The Ministry of New and Renewable Energy (MNRE) has invited proposals for concentrating solar thermal (CST) technology for Indian industries...

TANAKA

TANAKA to Showcase Precious Metal Technologies at Hydrogen Technology World Expo 2026 in Hamburg

by Urja Daily
September 9, 2026
0

TOKYO - TANAKA PRECIOUS METAL TECHNOLOGIES Co., Ltd. will exhibit for the first time at Hydrogen Technology World Expo 2026 from October 20–22, 2026,...

Renewable Energy

Renewable Energy: 8.6% CAGR Reveals the Data Behind Solar, Wind and Grid Transformation Through 2034

by Urja Daily
September 8, 2026
0

Something has quietly shifted in the power sector over the past five years, and most boardrooms haven't fully caught up...

Next Post
Laos and Myanmar

Laos and Myanmar Launch Feasibility Study for 2,790 MW Border Hydropower Project

POWERGRID

POWERGRID commissions transmission system for 7 GW Khavda RE zone

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Narendra Modi

Prime Minister Narendra Modi Met Delta Electronics’ Leadership to Chart India’s Next Decade of Energy Transition, AI Infrastructure, and Smart Manufacturing Growth

September 21, 2026
ESSCI

ESSCI, NIELIT ink MoU to boost semiconductor, AI, IoT and drone skilling

September 21, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0

Prime Minister Narendra Modi Met Delta Electronics’ Leadership to Chart India’s Next Decade of Energy Transition, AI Infrastructure, and Smart Manufacturing Growth

ESSCI, NIELIT ink MoU to boost semiconductor, AI, IoT and drone skilling

Construction-Tech Trimble Demonstrated Connected, AI-MC Jobsite Solutions at bauma CONEXPO INDIA 2026

Service developed to support decision-making for corporate EV fleet adoption

Why refurbished bikes are finding a place in India’s value-conscious Market?

Ai+ Smartphone to Cross 1,000 Plus Service Touchpoints; Announces First Exclusive Service Centre and Ai+ Assistance App

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved