Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

BluPine Energy and SJVN sign PPA for 150 MW assured peak power supply  

Palak by Palak
July 2, 2026
in News
Reading Time: 1 min read
0
BluPine Energy
Share on FacebookShare on TwitterShare on Linkedin

BluPine Energy has signed a power purchase agreement (PPA) with SJVN Limited for the supply of 150 MW of assured peak power under the SJVN FDRE-4 tender. The PPA has a tenure of 25 years and was signed at a tariff of Rs 6.74 per unit.

 The scope of work under the tender includes setting up a cumulative 1.5 GW of renewable energy projects integrated with energy storage systems to deliver 6 GWh (1.5 GW × 4 hours) of assured peak-hour power supply on a daily basis. The auction was conducted in October 2025 while the tender was floated earlier in December 2024.

RELATED POSTS

PwC India launches Connected Cybersecurity Solutions Centre in Bengaluru to secure the connected ecosystem

KKR Expands Energy Investments with EDF Portfolio Acquisition

 In May 2026, BluPine Energy signed a PPA with KEI Industries Limited for the supply of renewable power from a project in Badnoo, Bikaner, Rajasthan. The project forms part of BluPine Energy’s 150 MW hybrid solar and battery energy storage system development.

In January 2026, BluPine Energy Private Limited raised a Rs 54 billion long-term loan from Axis Bank with a repayment period of 16 to 20 years and an interest rate of approximately 7.7 per cent. The financing is secured against a portfolio of 17 renewable energy special purpose vehicles and will be used to refinance existing debt raised from various lenders.

Tags: Blupine EnergyKEI IndustriespowerRenewable EnergySJVN
ShareTweetShare
Palak

Palak

Related Posts

PwC India

PwC India launches Connected Cybersecurity Solutions Centre in Bengaluru to secure the connected ecosystem

by Palak
July 2, 2026
0

Bangalore -  PwC India announced the launch of its Connected Cybersecurity Solutions Centre (CCSC) in Bengaluru, a step further in...

KKR

KKR Expands Energy Investments with EDF Portfolio Acquisition

by Palak
July 1, 2026
0

EDF has signed an agreement under which KKR has agreed to acquire the US and Canadian operations and assets of...

StarlinePS & Celloraa

StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

by Palak
June 30, 2026
0

Surat, Gujarat : In a significant development for India's renewable energy manufacturing sector, StarlinePS Enterprises Ltd. has announced a strategic investment of ₹160 crore in Celloraa Energy Pvt....

BPCL, Shell and Tiki Tar Partner to Expand Bitumen Solutions

by Palak
June 30, 2026
0

Mumbai, Maharashtra, India - Bharat Petroleum Corporation Limited (BPCL) announced a strategic partnership with Tiki Tar and Shell India Private...

POWERCON Wins SKOCH

POWERCON Wins SKOCH Award for Sustainability, Joining India’s Leading Public and Private Sector Institutions

by Palak
June 29, 2026
0

Pune : POWERCON Group has been conferred the ‘SKOCH Silver Award for Sustainability – 2026’, reaffirming its commitment to advancing...

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

BluPine Energy

BluPine Energy and SJVN sign PPA for 150 MW assured peak power supply  

July 2, 2026
Vikran Engineering

Vikran Engineering Bags ₹35.18 Billion Solar EPC Order

July 2, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

BluPine Energy and SJVN sign PPA for 150 MW assured peak power supply  

Vikran Engineering Bags ₹35.18 Billion Solar EPC Order

South Korea awards 1.7 GW offshore wind projects 

RECPDCL Transfers Two ISTS SPVs to POWERGRID and HGIEL

Grenergy Secures 1 TWh Power Supply Agreement in Chile

PwC India launches Connected Cybersecurity Solutions Centre in Bengaluru to secure the connected ecosystem

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved