Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Jubilant Ingrevia Signs PPA with O2 Power for Renewable Energy

Palak by Palak
March 17, 2025
in Power
Reading Time: 1 min read
0
Jubilant
Share on FacebookShare on TwitterShare on Linkedin

Jubilant Ingrevia Limited, through its wholly owned subsidiary, Jubilant Infrastructure Limited has signed a power purchase agreement (PPA) with O2 Power to integrate renewable energy into its SEZ Bharuch manufacturing facility in Gujarat. This move follows similar agreements for its Savli, Gujarat, and Gajraula, Uttar Pradesh facilities, with renewable energy supply scheduled to begin in April 2025. 

With this agreement, 50 per cent of the Bharuch facility’s energy requirements will be met through renewable sources. Additionally, with this contract, over 35 per cent of Jubilant Ingrevia’s total energy requirement across all manufacturing facilities will be fulfilled through renewable sources. 

RELATED POSTS

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

Nepal to import 350 MW of electricity from India until July 2027

In January 2025, O2 Power secured an 800 MWh battery energy storage system project in Rajasthan under SECI’s FDRE Tranche VI auction, with commissioning expected within 24 months of the PPA signing.

Tags: Battery EnergyJubilantpowerRenewable Energy
ShareTweetShare
Palak

Palak

Related Posts

Oriana Power

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

by Palak
November 20, 2026
0

New Delhi, Delhi, India - TrueRE Oriana Power Limited, listed on NSE Emerge, and one of India’s leading integrated renewable...

Power

Nepal to import 350 MW of electricity from India until July 2027

by Palak
November 19, 2026
0

Nepal has secured approval to procure up to 350 MW of electricity from India between November 17, 2026 and July...

Power

Thermal Management & Reliability Testing in High-Power/High-Speed Boards

by Palak
November 18, 2026
0

As electronics move toward higher processing speeds, greater power density and increasingly compact form factors, thermal management and reliability testing...

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

Next Post
SWELECT

SWELECT Wins 150 MW Solar Module Orders

Eicher & Magenta Mobility

Eicher & Magenta Mobility Unveil Pro X Electric Truck for Green Logistics

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VAML Accelerates Low- Carbon Transition

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

November 20, 2026
Sharad

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

November 20, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

GREW SOLAR MOVES CLOSER TO THE MARKET

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

Nepal to import 350 MW of electricity from India until July 2027

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved