Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Vikram Solar Expands Capacity to 1 GW with Advanced Solar Modules

1 GW capacity expansion in Falta facility, WB Manufacturing lines upgraded in Oragadam facility, Chennai

Palak by Palak
February 20, 2025
in Solar
Reading Time: 2 mins read
0
Vikram Solar
Share on FacebookShare on TwitterShare on Linkedin

Kolkata : Vikram Solar Limited has successfully increased its manufacturing capacity with a 1 GW expansion at its Falta facility in West Bengal.  Additionally, the manufacturing lines in the facility at Oragadam in Chennai, Tamil Nadu, have also been upgraded to allow the facility to manufacture more efficient technology modules, including TOPCON and HJT.

These strategic initiatives are all set to boost Vikram Solar’s annual nameplate production capacity to 4.5 GW, marking a significant step forward in the company’s growth trajectory within the renewable energy sector. The Falta Project, which commenced with the installation of essential equipment on December 5, 2024, has now successfully achieved its planned 1 GW capacity expansion. Furthermore, the expansion project in Chennai launched in July 19, has been completed and has further enhanced the production capabilities at the Oragadam manufacturing facility.

RELATED POSTS

KPI Green Commissions 200 MW Solar Capacity in Gujarat

KPI Green Energy Limited Receives Charging Permission for 100 MW Solar Project Executed for MAHAGENCO in Maharashtra

Mr. Gyanesh Chaudhary, Chairman & Managing Director of Vikram Solar, further explains, “Vikram Solar’s Kolkata and Chennai manufacturing expansion will help us scale production and augment our capabilities to provide sustainable energy solutions. Both projects leverage advanced manufacturing techniques to enhance efficiency and ensure adherence to international quality and sustainability standards. They will enable us to supply high quality manufacturing panels, further fulfilling the vision of Atmanirbhar Bharat. It will be yet another milestone in our endeavour to power a cleaner and greener future.”

The expanded capacity and upgraded manufacturing lines underscore Vikram Solar’s commitment to driving innovation and scaling operations sustainably. With a combined nameplate capacity of 4.5 GW, Vikram Solar is positioned to make a significant impact on global reneable energy adoption, solidifying its leadership role in India’s green energy transition.

Tags: Green EnergyRenewable EnergysolarVikram Solar
ShareTweetShare
Palak

Palak

Related Posts

KPI Green Energy

KPI Green Commissions 200 MW Solar Capacity in Gujarat

by Palak
July 22, 2026
0

KPI Green Energy Limited has commissioned 200 MWac/269 MWdc of solar power capacity as part of the 300 MWac/405 MWdc...

KPI Green Energy Limited

KPI Green Energy Limited Receives Charging Permission for 100 MW Solar Project Executed for MAHAGENCO in Maharashtra

by Palak
July 21, 2026
0

New Delhi - KPI Green Energy Limited for its 100 MW (AC) / 128 MW (DC) grid-connected, ground-mounted solar PV...

Servotech Power Systems

Servotech Renewable Secures 900 kW Hybrid Solar Rooftop with BESS Project from UPSRLM, Rural Development Department, Govt. of UP

by Palak
July 17, 2026
0

New Delhi/Uttar Pradesh : Servotech Renewable Power System Ltd. has secured an order from the UPSRLM, Department of Rural Development, Government of...

Dushyant Kumar, PV Quality Manager

Why Investors Are Looking Beyond Solar Modules to Cells and Wafers and the Economics of Wafer Manufacturing

by Palak
July 15, 2026
0

A few years ago, the size of a solar manufacturer’s module capacity was enough to command investor attention. Today, that...

Bluebird Solar

Bluebird Solar Secures 439.35 MW Solar PV Module Supply Order from NTPC Renewable Energy Limited

by Palak
July 15, 2026
0

New Delhi : Bluebird Solar has secured a significant order from NTPC Renewable Energy Limited (NTPC REL) for the supply of 439.35...

Next Post
Yuma Energy

Yuma Energy Acquires Grinntech to Boost Battery Tech & Manufacturing

UiGo Bicycle

UiGo Transforms Kids' Cycling with Safety & Innovation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

EODev and Baudouin

EODev and Baudouin partner on high-efficiency, distributed power generation

July 22, 2026
AVILOO Battery

AVILOO Battery Warranty now available in Norway and Denmark

July 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

EODev and Baudouin partner on high-efficiency, distributed power generation

AVILOO Battery Warranty now available in Norway and Denmark

Tata Power Secures LoA for 324 MW Pumped Storage Project from SECI

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

POWERGRID wins India’s first ISTS SynCon project under TBCB

Spearmint Energy secures approval for 600 MWh Minnesota BESS

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved