Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Indonesia Set to Begin Trials for First Commercial Nuclear Power Plant

editor by editor
June 26, 2024
in Power
Reading Time: 1 min read
0
Nuclear Power Plant
Share on FacebookShare on TwitterShare on Linkedin

The National Research and Innovation Agency (BRIN) has announced plans to commence testing and operations of Indonesia’s first commercial nuclear power plant between 2030 and 2034.

This initiative aligns with Indonesia’s strategy to incorporate nuclear energy into its renewable energy  mix to achieve net zero emissions by 2060. Currently, the BRIN is working on the development of a small modular reactor called the 40 MW PeLUIt-40. The PeLUIt-40, a gas-cooled, ultra-high-temperature reactor, aims to produce 250 MW of power by 2032. To implement these plans, Indonesia will employ two strategies. The first involves collaborating with international vendors to implement small modular reactor technology.

RELATED POSTS

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

Nepal to import 350 MW of electricity from India until July 2027

Tags: BRINNuclear Power Plant
ShareTweetShare
editor

editor

Related Posts

Oriana Power

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

by Palak
November 20, 2026
0

New Delhi, Delhi, India - TrueRE Oriana Power Limited, listed on NSE Emerge, and one of India’s leading integrated renewable...

Power

Nepal to import 350 MW of electricity from India until July 2027

by Palak
November 19, 2026
0

Nepal has secured approval to procure up to 350 MW of electricity from India between November 17, 2026 and July...

Power

Thermal Management & Reliability Testing in High-Power/High-Speed Boards

by Palak
November 18, 2026
0

As electronics move toward higher processing speeds, greater power density and increasingly compact form factors, thermal management and reliability testing...

Power

Singapore and the Philippines Advance Plans for Cross-Border Power Connectivity

by Urja Daily
November 5, 2026
0

Singapore and the Philippines have agreed to explore opportunities for cross-border electricity interconnections and strengthen cooperation in nuclear energy.  The...

POWERGRID

POWERGRID Secures MCA Approval for Merger of 28 Wholly Owned Subsidiaries

by Urja Daily
November 5, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received approval from the Ministry of Corporate Affairs (MCA) for the merger...

Next Post
Renewable Energy

New Schemes Approved for Evacuating 4.5 GW Renewable Energy from Rajasthan and Karnataka

Singapore EMA

Singapore EMA Enhances Energy Management System for 2050 Green Energy Transition

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VAML Accelerates Low- Carbon Transition

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

November 20, 2026
Sharad

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

November 20, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

GREW SOLAR MOVES CLOSER TO THE MARKET

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

TrueRE Oriana Power to Set up Five CBG Projects Across Three States with 110 TPD Capacity; to Invest Rs. 750 Crores

Nepal to import 350 MW of electricity from India until July 2027

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved