Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Rooftop

Gujarat Waives Technical Feasibility for Rooftop Solar Systems Under 10 kW

editor by editor
May 28, 2024
in Rooftop, Solar
Reading Time: 1 min read
0
Gujarat Waives
Share on FacebookShare on TwitterShare on Linkedin

The Gujarat Electricity Regulatory Commission (GERC) has released the Draft Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024. In an effort to improve the integration of higher solar capacities into the grid while maintaining fair cost distribution, the draft introduces specific requirements for low- and high-tension customers installing rooftop solar systems.

The regulator has waived the requirement for a technical feasibility study for rooftop systems with a maximum capacity of 10 kW. The distribution company will manage any increase in the permitted load for the consumer. Distribution licensees are required under the new amendment to update the capacity of their transformers to connect rooftop solar systems on an annual basis. To guarantee openness and effective grid capacity management, this information must be given to the commission. A significant modification included in the amendment concerns charges related to strengthening the distribution network in order to facilitate rooftop solar installations.

RELATED POSTS

Bergen Pipe Supports Goes Solar with 700 kW Rooftop System from Orb Energy

GameChange Solar Boosts Manufacturing Capacity in Saudi Arabia

Tags: GERCGujarat WaivesRooftop Solar
ShareTweetShare
editor

editor

Related Posts

Orb Energy

Bergen Pipe Supports Goes Solar with 700 kW Rooftop System from Orb Energy

by Palak
June 9, 2025
0

Tirupati, Andhra Pradesh : Orb Energy announced that it has successfully installed and commissioned a 700-kilowatt rooftop solar system (350kWp as...

GameChange

GameChange Solar Boosts Manufacturing Capacity in Saudi Arabia

by Palak
June 5, 2025
0

GameChange Solar has expanded its regional manufacturing capacity in the Kingdom of Saudi Arabia to 6 GW annually. The expansion...

Waaree Renewable

Waaree Renewable Secures LoA for 300 MW Solar EPC Project in Rajasthan

by Palak
June 5, 2025
0

Waaree Renewable Technologies Limited has received a letter of award (LoA) from  Purvah Green Power for the engineering, procurement, and...

NTPC Green Energy

NTPC Green Energy Invites Bids for 600 MW Solar Module Supply in Gujarat

by Palak
June 5, 2025
0

NTPC Green Energy Limited has released a tender for bifacial crystalline solar modules supply for a 600 MW solar power...

Vikram Solar

Vikram Solar Receives SEBI Approval for IPO

by Palak
June 4, 2025
0

Vikram Solar Limited, one of India’s largest solar photo-voltaic (“PV”) modules manufacturers in terms of installed capacity, with more than...

Next Post
Karnataka government

Karnataka Issues Guidelines to Boost Rooftop Solar Installations

RWE Wind Farms

RWE Plans 1.6 GW Offshore Wind Farms

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

LNG Market

Leading LNG Exporters Driving the Global Market

June 9, 2025
Orb Energy

Bergen Pipe Supports Goes Solar with 700 kW Rooftop System from Orb Energy

June 9, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Leading LNG Exporters Driving the Global Market

Bergen Pipe Supports Goes Solar with 700 kW Rooftop System from Orb Energy

Recyclekaro Group Brings Recycling to the Doorstep with Its New D2C Platform

Errol Musk Wraps Up 6-Day India Tour, Applauds Green Tech and Rich Culture

HyperloopTT’s Italian Project Begins Operations

World Environment Day 2025

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved