Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

RUMSL Initiates Bidding for 170 MW Solar Project

editor by editor
April 30, 2024
in News
Reading Time: 1 min read
0
Rewa Ultra Mega Solar Limited
Share on FacebookShare on TwitterShare on Linkedin

Rewa Ultra Mega Solar Limited (RUMSL) has issued a request for proposals to set up a 170 MW grid-connected ground mounted solar project. To be located in Neemuch solar park in Madhya Pradesh, the electricity produced from the project will be purchased by Madhya Pradesh Power Company Limited and West Central Railway.

According to the tender guidelines, the bidders are required to furnish Rs 157.8 million as an earnest money deposit. With three days of letter of award acceptance, the developers are required to submit Rs 2.32 million per MW as performance security. RUMSL will allocate land for the project under the terms and conditions outlined in the land use agreement.  The bid submission deadline is June 7, 2024.

RELATED POSTS

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

South Eastern Railway Uses IsoMat Tech to Beat Heat on Tonbridge–Hastings Line

RUMSL will offer bidders a separate land layout within the Neemuch solar park. It will allocate around 341 hectares for the project, which will be transferred to the solar project developer. RUMSL internal power evacuation infrastructure for the project at the Neemuch solar park site (project substation) will be provided by RUMSL. It consists of a single 33/220 kV outdoor sub-station that is related to and allocated to the project. The project substation will feature two 110 MVA transformers and five 220 kV bays, which will include transformer feeders, nine 33 kV circuit terminals for project connections, and a single-circuit 220 kV transmission line that links the 220 kV side of the project substation to a bay at the 220/400 kV substation.

Tags: powerRUMSLSecuritysolar
ShareTweetShare
editor

editor

Related Posts

VinFast Swift

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

by Palak
August 18, 2025
0

Gurgaon, Haryana, India - India wants millions of electric vehicles on its roads by the end of the decade. That...

IsoMat

South Eastern Railway Uses IsoMat Tech to Beat Heat on Tonbridge–Hastings Line

by Palak
August 18, 2025
0

The South Eastern Railway has partnered with UK green tech start-up Flint Engineering to combat excessive heat in railway signalling cabinets that...

Watershed Organisation Trust

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

by Palak
August 13, 2025
0

Pune : The Watershed Organisation Trust (WOTR) has achieved a significant milestone with its digital advisory platform, FarmPrecise. The app has...

Walplast

Walplast Launches “Nova 125” Premium Gypsum Plaster for Superior Coverage and Performance

by Palak
August 13, 2025
0

Mumbai : Walplast Products Pvt. Ltd., has officially entered the premium gypsum category with the launch of Nova 125 - Premium Gypsum...

Stellantis India

Stellantis India Unveils Dual-Brand Retail Outlet in Ahmedabad to Expand Gujarat Presence

by Palak
August 12, 2025
0

Second Stellantis Brand House in Gujarat, following the Surat launch Full portfolio of both brands available, supported by advanced diagnostics...

Next Post
Gruner Renewable Energy

CBG Projects Receive Rs 15 Billion Funding Boost by Gruner Renewable Energy

Bihar Tender

Bihar Invites Tender for 200 MW RTS Projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

August 18, 2025
ITM Power

ITM Power Signs Agreement for Hydrogen Project in the UK

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

ITM Power Signs Agreement for Hydrogen Project in the UK

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

Offshore Wind Turbine Efficiency Market Projected to Hit $18.7 Billion by 2033

Innovations Driving Growth in the Fire Pump Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved