Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

NHPC hiring Consultants for DPR of 100 MW Floating Solar Projects in Odisha

Urja Daily by Urja Daily
September 11, 2020
in News
Reading Time: 2 mins read
0
NHPC hiring Consultants for DPR of 100 MW Floating Solar Projects in Odisha
Share on FacebookShare on TwitterShare on Linkedin

NHPC has issued a tender for hiring of consultants for the technical assistance and preparation of DPR of Floating Solar Projects of 100 MW capacity in Rengali Reservoir in Odisha.

In the first phase, a 100 MW floating solar plant shall be developed in the Rengali reservoir of Odisha. In this context, the vendor will prepare a Detail Project Report (DPR) in line with the standard format issued by MNRE, including additional studies related to floating solar for the proposed plant.

RELATED POSTS

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

GREW SOLAR MOVES CLOSER TO THE MARKET

As per the tender, only those bidders who have been issued the NIT are eligible for participation in the tendering process. The bids of those bidders who have not been issued the NIT shall not be considered for evaluation.

The consultants will need to analyse the change in water surface area based on a GIS-study of satellite collected data and also identify the patches of the reservoir which are suitable for the installation of the floating solar project at the reservoir. Assessment and calculation of the Solar PV Capacity that can be installed on the site location. And, the shading analysis and its impact on the solar system design also needs to be analysed, amongst multiple other duties and test all of which must be mentioned in the DPR.

The last date for bid submission is September 24, 2020, for online bids and September 28, 2020, for offline bids. The technical bids will be opened on September 28, 2020. The date and time of opening of the price bids will be intimated later to the bidders whose techno-commercial bids will be found responsive.

All bidders are required to submit an Earnest Money Deposit (EMD) of Rs 55 thousand along with their bids. However, Micro & Small Enterprises (MSEs) Units registered with the NSIC under multiple schemes or boards will be exempted from furnishing the Bid Security deposit/ EMD. Furthermore, startups as recognized by the Department of Industrial Policy & Promotion (DIPP) are also exempted from furnishing the Bid Security/ EMD.

MSEs will also be eligible for the purchase preference in the tender. Participating MSEs quoting price within the price band of L1+15 percent shall also be allowed to supply a portion of the requirement by bringing down their price in a situation where the L1 price is from someone other than an MSE and such MSEs shall be allowed to supply at least 25 percent of total tendered value. In case more than one such MSEs, the supply will be shared proportionately (to tendered quantity).

In July, NHPC had inked a Memorandum of Understanding (MoU) with the Green Energy Development Corporation of Odisha Limited (GEDCOL) to form a joint venture for developing floating solar energy projects in the state of Odisha with an initial capacity of 500 MW.

The two entities may collaborate and cooperate to form a joint venture company (JVC) to plan and develop techno-commercially feasible floating solar power projects of 500 MW in Odisha under the UMREPPs (Ultra Mega Renewable Energy Power Parks) scheme of the Ministry of New and Renewable Energy (MNRE), in a phased manner, preferably in packages of 50 MW each.

Tags: 100 MWFloating SolarIndiaNHPCNHPC 100 MW Floating SolarOdishaProjectstender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Waaree Renewable

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

by Palak
November 21, 2026
0

Waaree Transpower, a subsidiary of Waaree Energies, has secured an order worth over Rs 1 billion from NTPC for supplying...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW SOLAR MOVES CLOSER TO THE MARKET

by Palak
November 20, 2026
0

Mumbai / Ahmedabad, - GREW Solar announced a significant milestone on its path to becoming a listed company. BSE Limited...

LOI_Midwest Energy

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

by Palak
November 20, 2026
0

Hyderabad : Midwest Energy Limited has received a Letter of Intent (LOI) from the Ministry of Heavy Industries, Government of...

Executive Board of LAPP

Global growth: LAPP achieves sales of more than two billion euros for the first time

by Palak
November 17, 2026
0

Stuttgart – LAPP Group's global growth strategy is paying off: In fiscal year 2026 (1 October 2025 – 30 September...

Capital Trust Infra

Capital Infra Trust Reports Strong Q2FY27 Performance, Continues to Scale Annuity-Led Portfolio

by Palak
November 17, 2026
0

New Delhi : Capital Infra Trust a leading infrastructure investment trust (InvIT), announced on Friday, November 13, 2026, the financial results...

Next Post
8minute Signs PPA for 400 MW Solar Plus 540 MWh Storage With CPA

8minute Signs PPA for 400 MW Solar Plus 540 MWh Storage With CPA

IOCL Tenders for 2.75 MW Solar Plant in Trichy

IOCL Tenders for 2.75 MW Solar Plant in Trichy

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Waaree Renewable

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

November 21, 2026
Power

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

November 21, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Waaree Transpower Bags Transformer Order Worth Over Rs 100 Crore from NTPC

AESL Wins Bihar Transmission Project to Facilitate Power Evacuation from 2,400 MW Pirpainti Plant

VAML Accelerates Low-Carbon Transition with 63% Rise in Renewable Energy Use

India’s Renewable Energy Paradox: More Solar Capacity, but Is There Enough Storage?

GREW SOLAR MOVES CLOSER TO THE MARKET

Midwest Energy Receives LOI Under Centre’s ₹7,280 Crore Rare Earth Permanent Magnet Scheme

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved