Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

West Bengal Invites Bids for 2,000 MWh Battery Storage Project

Palak by Palak
April 6, 2026
in Storage
Reading Time: 1 min read
0
West Bengal
Share on FacebookShare on TwitterShare on Linkedin

West Bengal’s Department of Power, on behalf of West Bengal State Electricity Distribution Company Limited (WBSEDCL), has floated a tender for the development of 500 MW/2,000 MWh standalone battery storage systems (BESS). The BESS will be located across four substations. The DPL substation in Paschim Bardhaman, with a connectivity voltage level of 220 kV, accounts for the largest share with 200 MW/800 MWh capacity. The remaining three projects: Kharagpur in Paschim Medinipur, Hooghly-Arambag in Hooghly, and Jeerat in North 24 Parganas will each have a capacity of 100 MW/400 MWh, with a connectivity voltage level of 132 kV. 

According to the tender guidelines, the scope of work includes the installation of the BESS and its integration with WBSEDCL’s distribution network. It also involves ensuring that the energy storage system is available to WBSEDCL for on-demand charging and discharging. Successful bidders will be required to obtain a separate metered connection from WBSEDCL to meet the auxiliary power requirements of the battery storage systems. Additionally, the BESS will be technology agnostic.

RELATED POSTS

Himachal Pradesh Launches Spiti Valley’s First Solar Plant with Battery Storage

Premier Energies Subsidiary Signs JV Agreement for 12 GWh BESS Manufacturing

The storage systems are required to be commissioned within 18 months from the effective date of the battery energy storage purchase agreement (BESPA). Furthermore, the BESPA will remain valid for a period of 15 years from the date of project commissioning. The bidders are required to pay a document fee of Rs 500,000 along with a document processing fee of Rs 2,500. The project will be implemented under a build-own-operate model.

Tags: BatteryBESSElectricitypowerStorage
ShareTweetShare
Palak

Palak

Related Posts

Battery storage

Himachal Pradesh Launches Spiti Valley’s First Solar Plant with Battery Storage

by Urja Daily
October 21, 2026
0

The 2 MW plant is paired with a 1 MWh battery energy storage system (BESS) and was built at a...

Premier Energies

Premier Energies Subsidiary Signs JV Agreement for 12 GWh BESS Manufacturing

by Urja Daily
October 20, 2026
0

Premier Energies Limited’s wholly owned subsidiary, Premier Battery Technologies Private Limited (PBTPL), has executed a share allotment cum shareholders agreement...

Pace Digitek Limited

Pace Digitek Secures 115 MWh Battery Energy Storage Project from BRPL

by Urja Daily
October 12, 2026
0

Pace Digitek Limited has received a letter of intent (LoI) from BSES Rajdhani Power Limited (BRPL) for a 57.5 MW/115...

AMPT CEO

AmpereHour and Ampt Announce Strategic Partnership to Advance Direct-to-Battery DC-Coupled Storage Solutions Across India and Key Global Markets

by Urja Daily
October 12, 2026
0

Mumbai : AmpereHour Energy announced a strategic partnership under which AmpereHour will distribute and service Ampt’s DC power management products across...

AmpereHour Energy

AmpereHour and Ampt Announce Strategic Partnership to Advance Direct-to-Battery DC-Coupled Storage Solutions Across India and Key Global Markets

by Urja Daily
October 9, 2026
0

Mumbai : AmpereHour Energy announced a strategic partnership under which AmpereHour will distribute and service Ampt’s DC power management products across...

Next Post
Vikran Engineering

Vikran Engineering Bags Power Distribution Deals in Maharashtra

GlobalLogic

Gujarat CM Shri Bhupendra Patel Inaugurates AMTC’s EV Bus Fleet assessed by IRCLASS and GlobalLogic 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Fujitsu

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

October 22, 2026
Yash Highvoltage

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

October 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Fuel Shocks Make Farm Waste a Strategic Industrial Fuel for India, says Ankur Scientific as it Marks 40 Years of R&D

How India’s Next Solar Bottleneck May Not Be Land, Capital or Technology and Could be Skilled Manpower?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Comau Partners with NVIDIA to Advance Physical AI in Industrial Robotics

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved