Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

WBSEDCL Invites Bids for Solar and Storage Project

Palak by Palak
February 11, 2026
in Solar, Storage
Reading Time: 1 min read
0
SolarMax
Share on FacebookShare on TwitterShare on Linkedin

West Bengal State Electricity Distribution Company Limited (WBSEDCL) has floated a tender for the development of a 100 MW solar power project with a 25 MW/100 MWh battery energy storage system (BESS). The project will be situated at Goaltore in the Paschim Medinipur district of West Bengal (Phase II).

According to the tender guidelines, the scope of work covers the design, engineering, supply, construction, and commissioning of the solar plus storage system. It also encompasses providing 12-year operations and maintenance services for the project. Furthermore, the contractor is required to guarantee a minimum level of annual energy output from the solar project, determined using local weather data and the minimum performance parameters of the BESS. The bid submission deadline is March 23, 2026. 

RELATED POSTS

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Earlier in November 2025, WBSEDCL called for bids to supply, install, operate, and manage electric vehicle charging and battery-swapping stations.

Furthermore, in October 2025, WBSEDCL issued a tender to set up 250 MW/1,000 MWh standalone BESS at the Goaltore substation in Paschim Midnapore, West Bengal.

Tags: Battery EnergysolarStorageWBSEDCL
ShareTweetShare
Palak

Palak

Related Posts

Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

by Palak
August 22, 2026
0

New Delhi : The rooftop solar market in India has moved well beyond the early stage of convincing households to...

Servotech Renewable Power System Ltd.

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

by Palak
August 20, 2026
0

New Delhi : Servotech Renewable Power System Ltd. has launched its latest TVC under its ongoing brand campaign featuring actor...

KPI Green Energy

KPI Green Energy Commissions 130 MW Solar Capacity in Gujarat

by Palak
August 20, 2026
0

KPI Green Energy Limited has commissioned 130 MWac/195 MWdc of solar capacity under its 370 MWac/677 MWdc wind-solar hybrid power...

BESCOM Floats Tender for 500 MW Solar Projects

BESCOM Floats Tender for 500 MW Solar Projects

by Palak
August 20, 2026
0

Bangalore Electricity Supply Company Limited (BESCOM) has invited tenders for the installation of 500 MW of solar under the Mukhyamantri Saura...

Inox Clean Energy

Inox Clean Energy completes Rs 60 billion acquisition of Vena Energy India

by Palak
August 20, 2026
0

Inox Clean Energy Limited, part of the INOXGFL Group, has completed the acquisition of Vena Energy India Holdings Pte Ltd,...

Next Post
Solar

GULF Raises Funds for 939 MW Renewables in Thailand

KPI Green Energy

KPI Green Energy secures order for a 300 MWac renewable power project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Beyond Installation: What Defines a Successful Industrial Solar Project?

August 22, 2026
Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

August 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Beyond Installation: What Defines a Successful Industrial Solar Project?

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

VinFast India Partners with Federal Bank to Strengthen Dealer Financing Ecosystem

MC²+ Ignite Selects 30 Energy Deep-Tech Startups for Funding

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Nuvoton Begins Production of 16-Cell Battery Monitoring ICs for AI Servers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved