Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Vistra Announced Expansion of World’s Largest Battery Energy Storage

Urja Daily by Urja Daily
January 25, 2022
in News, Storage
Reading Time: 3 mins read
0
Vistra
Share on FacebookShare on TwitterShare on Linkedin

IRVING, Texas — Vistra announced that it plans to further expand its Moss Landing Energy Storage Facility in Moss Landing, California. The company has entered into a 15-year resource adequacy agreement with Pacific Gas and Electric Company (PG&E) for a new 350-megawatt/1,400-megawatt-hour battery system. This would complement the existing 400 MW/1,600 MWh of energy storage capacity already at the site. On Jan. 21, 2022, PG&E filed its application with the California Public Utilities Commission (CPUC) to approve the contract, with a decision expected within 180 days. 

“Through this partnership with PG&E, Vistra is bringing its capabilities and expertise to lead the clean energy transition and provide much-needed electricity to the people of California,” said Curt Morgan, Vistra CEO. “These innovative battery energy storage systems are necessary to maintain electric grid reliability as increasing levels of intermittent renewable power are integrated into the electric grid.”

RELATED POSTS

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Like previous phases, Moss Landing Phase III will be able to move quickly due to the utilization of an already-approved development permit and its location on a Vistra-owned power plant site with existing interconnection and infrastructure. At its plant sites in California and across the country, Vistra is leading the way in responsibly reclaiming and repurposing sites that have been historically used for fossil fuels, transforming them with renewables and battery storage, leading to economic activity and tax base for the communities.

Today’s announcement brings the Moss Landing site’s total energy storage capacity to 750 MW/3,000 MWh, the largest of its kind in the world: 

  • Moss Landing â€“ Phase I (300 MW/1,200 MWh)
  • Moss Landing â€“ Phase II (100 MW/400 MWh)
  • Moss Landing â€“ Phase III (350 MW/1,400 MWh)

Morgan continued, “With this planned expansion, we are moving the Moss Landing site closer to its full potential. With additional phases, this project could eventually reach 1,500 MW – enough to power approximately 1.125 million homes across the state of California with emission-free electricity. Vistra is committed, through our Vistra Zero portfolio, to transitioning the company to address climate change – and our Moss Landing site is a shining example of the pivot of our generation fleet toward carbon-free technologies.”

Pending the receipt of CPUC approval, Vistra anticipates construction on the third phase of the Moss Landing battery energy storage project will commence in May 2022 and will begin commercial operations prior to June 2023. 

With a robust pipeline of projects, Vistra plans to grow its zero-carbon Vistra Zero portfolio to 7,300 MW by 2026. This includes 5,000 MW of renewables and energy storage and the company’s 2,300-MW emission-free nuclear facility, Comanche Peak. In addition to its California projects, the company currently has six solar installations and 11 other storage and solar-plus-storage facilities, all in various stages of development and operations in Texas and Illinois. Ahead of this summer, Vistra will bring online its 50-MW Brightside Solar Facility, the 108-MW Emerald Grove Solar Facility, and the 260-MW DeCordova Energy Storage Facility – all in the Texas ERCOT market.

Tags: ElectricEnergy StorageVistra
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

by Urja Daily
November 12, 2026
0

Problem gambling affects millions of people worldwide, causing financial difficulties, relationship strain, and severe mental health challenges. non GamStop UK...

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

Battery & Energy Storage

CEA and DEA publish technology catalogues on energy storage and green fuels

by Urja Daily
November 12, 2026
0

The Central Electricity Authority (CEA) and the Danish Energy Agency (DEA) have jointly published the first editions of the Indian...

STMicroelectronics

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

by Urja Daily
November 12, 2026
0

One unified STM32 platform enables customers to reuse architectures, IP, software and tools across industrial, automotive, and robotics applications The new...

Next Post
Azure-Power

Azure Power's Rights Issue Closes For Subscription

tke

TK Elevator Is Conferred With The First Prize for Excellence in Energy Conservation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved