Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Union Power Minister Evaluates Power Sector in Himachal Pradesh and Uttarakhand

editor by editor
July 23, 2024
in Power
Reading Time: 1 min read
0
Union Power Minister
Share on FacebookShare on TwitterShare on Linkedin

The Union Minister for Power and Housing and Urban Affairs Manohar Lal, took stock of the power sector in Himachal Pradesh and Uttarakhand. He reviewed Revamped Distribution Sector Scheme (RDSS), hydro sector projects, power sector reforms and measures relating to ease of living in both states. 

He stressed the need to quickly implement the works under RDSS, reduce AT&C losses to less than 10 per cent, reduce financial burden on distribution companies by eliminating the difference between average cost of supply and average revenue. Prioritisation of implementation of system metering to effectively monitor and account for the electricity consumption and losses in the states.

RELATED POSTS

AESL Takes Over Vizag Power Transmission SPV

Singapore Approves 900 MW Malaysia Clean Power Imports

He also announced that 250 MW of a 1,000 MW PSP project is expected to be commissioned by August 2024 in Tehri. 

According to the government’s press release, India has hydro power potential of around 133 GW, of which around 42 GW (32 per cent) has been developed so far. The potential of PSP is also approximately 133 GW, of which only 4.75 GW (3.6 per cent) has been developed so far. Similarly, Uttarakhand has a potential of 14.5 GW, of which 4 GW has been developed and 5.6 GW is under development.

Tags: ElectricitypowerPrime MinisterRDSS
ShareTweetShare
editor

editor

Related Posts

RECPDCL

AESL Takes Over Vizag Power Transmission SPV

by Palak
August 19, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vizag Power Transmission Limited, the special purpose vehicle (SPV) for an...

Singapore Solar

Singapore Approves 900 MW Malaysia Clean Power Imports

by Palak
August 19, 2026
0

Singapore’s Energy Market Authority (EMA) has granted conditional approvals to Sembcorp Utilities Pte Ltd and Southern Solar Alliance Pte Ltd...

RECPDCL

AESL Acquires Vizag Power Transmission SPV from RECPDCL

by Palak
August 18, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred Vizag Power Transmission Limited, the special purpose vehicle (SPV) for an...

TARIL

TARIL Wins ₹500 Crore APTRANSCO Transformer Order

by Palak
August 17, 2026
0

Transformers And Rectifiers (India) Limited (TARIL) has received a letter of intent from Transmission Corporation of Andhra Pradesh Limited (APTRANSCO)...

POWERGRID

Bajel Projects secures orders worth over Rs 7 billion from POWERGRID

by Palak
August 12, 2026
0

Bajel Projects Limited has secured two orders from Power Grid Corporation of India Limited (POWERGRID) under the Western Region-Eastern Region...

Next Post
GUVNL

GUVNL Seeks Bids for 500 MW Wind Energy Projects

Jakson Green Private

First Abu Dhabi Bank Extends Rs 2.96 Billion Credit to Jakson Green

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Beyond Installation: What Defines a Successful Industrial Solar Project?

August 22, 2026
Shweta Solar

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

August 22, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Beyond Installation: What Defines a Successful Industrial Solar Project?

Shweta Solar pushes for stronger storage and grid readiness as rooftop solar expands

VinFast India Partners with Federal Bank to Strengthen Dealer Financing Ecosystem

MC²+ Ignite Selects 30 Energy Deep-Tech Startups for Funding

Servotech Renewable Launches New TVC for Solar Lithium Batteries Featuring Sonu Sood

Nuvoton Begins Production of 16-Cell Battery Monitoring ICs for AI Servers

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved