Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Union Power Minister Evaluates Power Sector in Himachal Pradesh and Uttarakhand

editor by editor
July 23, 2024
in Power
Reading Time: 1 min read
0
Union Power Minister
Share on FacebookShare on TwitterShare on Linkedin

The Union Minister for Power and Housing and Urban Affairs Manohar Lal, took stock of the power sector in Himachal Pradesh and Uttarakhand. He reviewed Revamped Distribution Sector Scheme (RDSS), hydro sector projects, power sector reforms and measures relating to ease of living in both states. 

He stressed the need to quickly implement the works under RDSS, reduce AT&C losses to less than 10 per cent, reduce financial burden on distribution companies by eliminating the difference between average cost of supply and average revenue. Prioritisation of implementation of system metering to effectively monitor and account for the electricity consumption and losses in the states.

RELATED POSTS

POWERGRID secures LoI for ISTS augmentation project under TBCB

Power Grid Corporation of India Limited Secures LoI for ISTS Augmentation Project Under TBCB

He also announced that 250 MW of a 1,000 MW PSP project is expected to be commissioned by August 2024 in Tehri. 

According to the government’s press release, India has hydro power potential of around 133 GW, of which around 42 GW (32 per cent) has been developed so far. The potential of PSP is also approximately 133 GW, of which only 4.75 GW (3.6 per cent) has been developed so far. Similarly, Uttarakhand has a potential of 14.5 GW, of which 4 GW has been developed and 5.6 GW is under development.

Tags: ElectricitypowerPrime MinisterRDSS
ShareTweetShare
editor

editor

Related Posts

POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

by Palak
July 14, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received a letter of intent (LoI) under the tariff-based competitive bidding (TBCB)...

POWERGRID

Power Grid Corporation of India Limited Secures LoI for ISTS Augmentation Project Under TBCB

by Palak
July 13, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has received a letter of intent (LoI) under the tariff-based competitive bidding (TBCB)...

Tata Power

Tata Power Renewable Commissions 100.8 MW Jewali Wind Project

by Palak
July 7, 2026
0

Tata Power Renewable Energy Limited (TPREL) has commissioned its 100.8 MW Jewali wind project in Dharashiv district, Maharashtra. The electricity...

POWERGRID

RECPDCL Transfers Two ISTS SPVs to POWERGRID and HGIEL

by Palak
July 2, 2026
0

REC Power Development and Consultancy Limited (RECPDCL) has transferred two project-specific special purpose vehicles (SPVs) for inter-state transmission projects to...

Grenergy

Grenergy Secures 1 TWh Power Supply Agreement in Chile

by Palak
July 2, 2026
0

Grenergy has signed a power purchase agreement (PPA), securing a 15-year contract to supply 1 TWh of electricity annually to...

Next Post
GUVNL

GUVNL Seeks Bids for 500 MW Wind Energy Projects

Jakson Green Private

First Abu Dhabi Bank Extends Rs 2.96 Billion Credit to Jakson Green

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved