Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Trina Solar Shiped 210 Vertex Modules For 850 MWp PV Project

Urja Daily by Urja Daily
August 9, 2021
in Solar
Reading Time: 2 mins read
0
Trins Solar Vertex
Share on FacebookShare on TwitterShare on Linkedin

Trina Solar is the major vendor of photovoltaic modules for Futura 1, a project with 22 solar energy parks, under development by Focus Energia, in Juazeiro, Bahia, Brazil.  

The project will be implemented in three phases. The first phase has an installed capacity of 850 MWp, which places the project among the largest currently in development in Brazil. 

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

The initial modules will leave China in 108 containers in the second week of August with 59,292 pieces of 600W series of modules. These bifacial modules with 210 mm cells are part of Trina Solar’s Vertex line, representing the latest technology available in the market. These high-powered products currently produced by Trina Solar are making room for the 670W successor, which is already available for order for next year. 

“Trina Solar has the most advanced technology and the most powerful modules with great performance. This, for sure, helped Focus to choose us,” said Álvaro García Maltrás, Trina Solar’s vice president for Latin America and the Caribbean. 

According to Focus Energia, the project’s energy production will be entirely destined for the free market. The strategy follows the latest trend in which renewable energy generation entrepreneurs tend to prefer to negotiate directly with clients, instead of competing in auctions promoted by Aneel, to serve the captive market exclusively. 

According to Alan Zelazo,  Focus CEO, it is estimated that the project will directly generate 2,000 jobs, and an additional 4,000 jobs indirectly. 

Furthermore, Futura 1 comes at an opportune moment. “Despite being a long-term project, we are pleased to collaborate with the country to increase its production capacity in an extremely severe water crisis period.” 

The project is already underway with 550 workers on site. Operations are scheduled to begin in April 2022. 

Trina Solar in Brazil 

Operating in Brazil since 2017, Trina Solar sees great potential in the country. “Brazil is Latin America’s leading market for solar energy. It is a super dynamic market in high growth and a priority for Trina Solar. We entered a little later than our competitors, but we are now consolidating ourselves in the country,” says Alvaro.  

Trina Solar has already installed hundreds of megawatts in the Latin American and Caribbean region and is advancing with new contracts with other important customers in the Brazilian market. 

Tags: Futura 1photovoltaic moduleSolar EnergyTrina Solar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
VIKRAM SOLAR

Vikram Solar Becomes INDIA’S Largest Module Manufacturer With Upto 2.5 GW Capacity

Platts Dimensions Pro

S&P Global Platts Launched Platts Dimensions Pro

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

August 3, 2026
Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Brookfield Launches Renewable Energy Platform Lumara

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved