Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Sungrow Installed 130 MWp Bagerhat Solar Power Plant

Urja Daily by Urja Daily
December 20, 2021
in Solar
Reading Time: 3 mins read
0
Sungrow
Share on FacebookShare on TwitterShare on Linkedin

KHULNA, Bangladesh – Sungrow has announced recently that Bangladesh’s largest PV project – the 130 MWp Bagerhat solar power plant with Sungrow’s central inverter solutions installed came into commercial operation in late December 2021. Working closely with ABB and Orion Group, Sungrow will offer its expertise and continue to support Bangladesh in its energy transition journey.

With 95% of Bangladesh’s power generation stemming from gas, diesel, and coal, this 130 MWp project is a significant development for a nation that had a total grid-connected capacity of approximately 100 MW in 2020.

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Located in Khulna, the Bagerhat project overtook the 73 MW Mymensingh solar power plant as Bangladesh’s largest solar power plant upon its completion. Utilizing Bangladesh’s 2,500 hours of sunshine per year, the project will be able to generate power equivalent to that produced by more than 324,000 tons of coal a year. It is so far the largest eco-friendly power project to provide clean energy by using the most efficient monocrystalline solar panels and over 99% efficient inverters. This plant is connected to 132/33 KV Mongla PGCB Grid Substation through a newly constructed around 9 km transmission line.

Due to Bangladesh’s humid and hot climate, ABB has chosen to deploy Sungrow’s advanced SG3125HV 1500Vdc system for its efficiency and cost-effectiveness. The SG3125HV features temperature-controlled air cooling which allows it to operate without derating even when the temperature is up to 50 degrees Celsius. Moreover, its design allows for investment savings in the form of lower transportation and installation costs.

The investor of this project, Orion Group is a leading conglomerate and a legendary brand name in the business arena of Bangladesh. “We needed a solution that offers the most upside in terms of performance, cost-effectiveness, and compatibility with the conditions of the project. Sungrow, as a pioneer, was able to surpass all of our expectations with their state-of-the-art product,” commented Mehedi Islam Aneek, Project Manager of Orion Group.

Recently, the government of Bangladesh unveiled its renewable energy generation strategy for the Eighth Five-Year Plan period. The government said the new strategy will have to be aggressively pursued so that all that is planned to get implemented in time and the required policy support is prioritized. Citing the significant success of the introduction of rooftop PV systems and the role solar energy has played in providing lighting for homes, the Bangladeshi government said that the Eighth Five-Year Plan will continue to focus on solar and wind power development.

“We are honored and excited to be a part of the first 130 MWp scale solar project in Bangladesh. Bangladesh’s rapid industrialization has led to a drastic demand increase for power generation and the government is more focused on renewable energy development than ever before. With our experience and expertise, Sungrow is ready to expand our footprint in this growing market and assist Bangladesh in reaching its renewable power generation targets and beyond,” said Hu Yukun, Regional Manager, South Asia of Sungrow.

For more information, please visit www.sungrowpower.com.

Tags: inverter solutionPGCB GridSolar Panelssolar power plantSungrow
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
WAAREE Energies

WAAREE Supplied 2.4 MW of Solar Modules to Kochi Metro Rail

Eco Innovation Group

Eco Innovation Group Files Patent Application for PoolCooled

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved