Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power Smart Grid

Selection of SPDs for Setting Up of 75 MW Grid Connected :UPNEDA

Urja Daily by Urja Daily
May 18, 2021
in Smart Grid, Tenders
Reading Time: 3 mins read
0
Grid connected
Share on FacebookShare on TwitterShare on Linkedin

This Request for Selection (RfS) document is not an agreement or offer by the UPNEDA to the prospective Bidders or any other party. The purpose of this RfS is to provide interested parties with information to assist the formulation of their Bid. This RfS is based on material and information available in public domain.

This RfS, along with its Formats, is not transferable. While this RfS has been prepared in good faith, neither UPNEDA nor its employees make any representation or warranty express or implied as to the accuracy, reliability or completeness of the information contained in this RfS.

RELATED POSTS

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

Neither UPNEDA Representative, nor its employees will have any liability to any Bidder or any other person under the law of contract, tort, the principles of restitution or unjust enrichment or otherwise for any loss, expense or damage which may arise from or be incurred or suffered in connection with anything contained in this RfS, any matter deemed to form part of this RfS, the
award for supply of power, the information supplied by or on behalf of UPNEDA or its employees, any consultants or otherwise arising in any way from the selection process for the said supply of power

This RFS is not an agreement and is neither an offer nor invitation by UPNEDA to the prospective Bidders or any other person. The purpose of this RFS is to provide interested parties with information that may be useful to them in the formulation of their Offers pursuant to this RFS. This RFS may not be appropriate for all persons, and it is not possible for UPNEDA, its employees or
advisers to consider the objectives, technical expertise and particular needs of each party who reads or uses this RFS. The assumptions, assessments, Statements and information contained in this RFS, may not be complete, accurate, adequate or correct. Each Bidder should, therefore, conduct its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the assumptions, assessments and information contained in this RFS and obtain independent advice from appropriate sources.

UPNEDA also accepts no liability of any nature whether resulting from negligence or otherwise however caused arising from reliance of any Bidder upon the Statements contained in this RFS.

UPNEDA may in its absolute discretion, but without being under any obligation to do so, update, amend or supplement the information, assessment or assumption contained in this RFS.

The Bidder shall bear all its costs associated with or relating to the preparation and submission of its Offer including but not limited to preparation, copying, postage, delivery fees, expenses associated with any demonstrations which may be required by UPNEDA or any other costs incurred in connection with or relating to its Offer. All such costs and expenses will remain with the Bidder and
UPNEDA shall not be liable in any manner whatsoever for the same or for any other costs or other expenses incurred by an Bidder in preparation for submission of the Offer, regardless of the conduct or outcome of the Selection Process.

For more information, please click here: click here

Tags: 75 MWGrid ConnectedSPDsUPNEDA
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

Next Post
SB Energy Solar Plant

AGEL to Acquire SB Energy’s 5000 MW India Renewable Power Portfolio For a Fully Completed EV of USD 3.5 Bn

Zero Electric Vehicles

ZEV Announced its Class 3 Conversion Kit

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automotive Skills Development Council

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

June 25, 2025
AXITEC Energy

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

June 25, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

Top 5 Emerging Opportunities in the LDPE Market

COMAU Unveils MYCO Collaborative Robots at Automatica 2025

Are Your Electronics Ready for Summer Shipping Challenges?

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved