Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

SECI floats tender for 2 GW solar projects with 4 GWh ESS

Palak by Palak
June 16, 2025
in Solar
Reading Time: 1 min read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Solar Energy Corporation of India (SECI) has issued a request for selection to develop 2,000 MW of interstate transmission system (ISTS)-connected solar projects along with 1,000 MW/4,000 MWh energy storage systems (ESS). 

According to the tender guidelines, the project scope includes establishing the ISTS connectivity up to the delivery point, securing necessary land, and ensuring ownership, approvals, and interconnection. The minimum bid capacity allowed for a single bidder  is 50 MW, and the maximum bid capacity is 1,000 MW. The bidders must also ensure the ESS is set up at a minimum ratio of 0.5 MW/2 MWh per 1 MW of solar capacity. Furthermore, the bidders must submit a money deposit of Rs 1.4 million. The modules and cells used in the projects must be sourced from the Approved List of Models and Manufacturers. The deadline for bid submission is July 22, 2025.

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

According to the eligibility criteria, the bidders must have a net worth of at least Rs 14.24 million in the last financial year. Additionally, they must have an annual turnover of Rs 8 million in the same period.

Tags: ESSISTSSECIsolarStorage
ShareTweetShare
Palak

Palak

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
Rayzon Solar

Rayzon Solar Set to File Draft Papers with SEBI for Rs 15 Billion IPO

Envision Energy

Envision Energy Partners with SUN Terra to Build Comprehensive Energy Storage Ecosystem

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved