Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Scatec Signs PPA for 120 MW Solar EPCProject in Tunisia

Palak by Palak
March 27, 2025
in Solar
Reading Time: 1 min read
0
Solar
Share on FacebookShare on TwitterShare on Linkedin

Scatec has inked a 25-year power purchase agreement (PPA) for a 120 MW solar power plant named Sidi Bouzid II in Tunisia. The PPA has been signed with Tunisian state utility Société Tunisienne de l’Electricité et du Gaz (STEG). Scatec also inked a joint development agreement, with Aeolus SAS which is a part of the Japanese conglomerate Toyota Tsusho Group, for the solar plant. 

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

Furthermore, the estimated total capital expenditure for the project is €87 million. Scatec will act as the designated engineering, procurement, and construction (EPC) provider with an EPC share of approximately 85 per cent of capital expenditure for the project. 

Earlier in February 2024, Scatec inked a deal to build a 1 GW solar project to supply clean energy to Egypt Aluminium Company’s facility in Nagaa Hammadi, Upper Egypt. As per the agreement, Egypt’s Ministry of the Public Business Sector announced that the 500 MW solar park will be built in two stages, the first of which will be finished in 18 months after the deal is signed and the second in 24 months.

Tags: EgyptScatecsolarSTEG
ShareTweetShare
Palak

Palak

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
FLIR-Si1-LD-Complete

FLIR Si1-LD: High-Performance Acoustic Imaging Camera for Affordable Compressed Air Leak Detection

Servotech Renewable Power System Ltd.

Servotech Renewable Power System Ltd. Secures Patent for Innovative Peak Shaving Technology

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved