Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

POWERGRID Invites Bids for 300 MWh Battery Storage Project

Palak by Palak
May 17, 2026
in Storage
Reading Time: 1 min read
0
POWERGRID
Share on FacebookShare on TwitterShare on Linkedin

Power Grid Corporation of India Limited (POWERGRID) has invited tender for design, supply, erection, testing and commissioning of a 150 MW/300 MWh battery energy storage system (BESS) project at Kalikiri in Andhra Pradesh. The package is part of the larger programme for setting up 1,000 MW/2,000 MWh BESS capacity in Andhra Pradesh under tariff based competitive bidding supported through viability gap funding through PSDF. 

Furthermore, the bidding process will be conducted through domestic competitive bidding under a single stage two envelope e-procurement model and has been issued through an open tender invitation process with domestic financing. The deadline for bid submission has been scheduled for June 4, 2026.

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

In January 2026, POWERGRID issued a tender for the development of a 125 MW/500 MWh standalone BESS connected to the state transmission network. The project is being implemented on behalf of Chhattisgarh State Power Distribution Company Limited.

Tags: BatteryBESSpowerpowergridStorage
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
Inox Green Energy

Inox Clean Energy acquires US-based Boviet Solar in $750 million deal

IGL and RVUNL

IGL invites bids to set up 200 MW solar project in Rajasthan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved