Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Power Ministry announced Drafts Rights of Electricity Consumers for the First Time

Urja Daily by Urja Daily
September 16, 2020
in News
Reading Time: 2 mins read
0
Power Ministry announced Drafts Rights of Electricity Consumers for the First Time
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of Power has announced that it has drafted rules providing for the Rights of Electricity Consumers for the very first time.

The Ministry of Power has announced that it has drafted rules providing for the Rights of Electricity Consumers for the very first time. In its notification, the ministry claims the electricity consumers are the most important stakeholders in the power sector, the sector exists because of them.

RELATED POSTS

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

“Having provided access to electricity to all citizens, it is now important to focus on consumer satisfaction. For this, it is imperative to identify the key services, prescribe minimum service levels and standards with respect to these services and recognise them as rights of consumers,” the ministry issued in a statement.

The main feature of the draft regulation are:

• Recognition to the emerging category of consumers known as “Prosumers”. Persons who are consumers and have also set up rooftop solar units or solarised their irrigation pumps. They will have the right to produce electricity for self-use and inject excess in the grid using the same point of the connection up to limits prescribed by the SERC.

• Reliability of service: State Electricity Regulatory Commissions (SERCs) to fix the average number and duration of outages per consumer per year for Discoms.

• Timely and simplified procedure for connection: Only two documents for connection up to load of 10 kW and no estimation of demand charges for loads up to 150 kW to expedite giving connection.

• Time period of not more than 7 days in metro cities, 15 days in other municipal areas and 30 days in rural areas, to provide new connection and modify existing connection.

• 2 to 5 percent rebate on serving bills with a delay of sixty days or more.

• Option to pay bills in cash, cheque, debit cards, net banking, etc but bills of Rs 1000 or more to be paid online.

• Provisions related to disconnection, reconnection, meter replacement, billing, payment, etc.

• Compensation/ penalties for delay in service by Discoms; compensation to be automatic as far as possible, to be passed on in the bill.

• 24×7 toll-free call centre, web-based and mobile applications for common services like new connection, disconnection, reconnection, shifting of connection, change in name and particulars, load change, replacement of meter, no supply, etc with facilities for SMS /email alerts, online status tracking and auto-escalation.

• Consumer Grievance Redressal Forum with 2-3 representatives of consumers at various levels starting from Sub-division for ease of consumer grievance redressal.

The draft rules have been circulated by the Ministry of Power for comments/ views/ suggestions from consumers latest by September 30, 2020. After this, the suggestions will be evaluated and the final rules issued.

Tags: Electricity ComsumersMinistry of PowerRightsRights of Electricity Consumers
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

by Urja Daily
November 12, 2026
0

Problem gambling affects millions of people worldwide, causing financial difficulties, relationship strain, and severe mental health challenges. non GamStop UK...

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

STMicroelectronics

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

by Urja Daily
November 12, 2026
0

One unified STM32 platform enables customers to reuse architectures, IP, software and tools across industrial, automotive, and robotics applications The new...

Link Factory verification

by Urja Daily
November 11, 2026
0

verification

Next Post
Exide Forms Li-ion JV; Working on Solutions for Hybrids and EVs said on September 15, 2020

Exide Forms Li-ion JV; Working on Solutions for Hybrids and EVs said on September 15, 2020

Cochin Port Trust Tenders for 1.5 MW Floating Solar Projects in Kerala

Cochin Port Trust Tenders for 1.5 MW Floating Solar Projects in Kerala

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved