Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Pivot Energy Completed Building-Integrated Solar Project

Urja Daily by Urja Daily
September 29, 2021
in Solar
Reading Time: 2 mins read
0
Pivot Energy
Share on FacebookShare on TwitterShare on Linkedin

BOULDER, Colo. – Pivot Energy and Morgan Creek Ventures are excited to announce the completion of Phase 2 of the Boulder Commons’ integrated solar energy project. The 318-kilowatt (kW) facility sets a new standard for sustainable building design and construction.

Boulder Commons’ owner Morgan Creek Ventures (MCV) is a developer dedicated to sustainability, and their leadership sees Boulder Commons as a project that brings the future of real estate into focus. They set out to achieve high energy performance from the project’s onset, which required a thoughtful balance of energy efficiency and renewable energy generation.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

During project planning, it became apparent that MCV’s ambitious energy goals could not be attained with rooftop solar alone as the Boulder Commons structures are four-story buildings located in a cold climate and require significant energy. The solution was to install 101 kW of vertically mounted solar panels on the southeast-facing facade in addition to 217 kW on the roof.

To help bring this unique building-integrated photovoltaic (BIPV) project from concept to completion, MCV called on national solar provider Pivot Energy, local Colorado architect Coburn, and solar engineering BIPV specialist Solmotiv. Together, the team designed and developed a customized vertical facade and ballasted rooftop solar PV system that generates a total of 318 kW, helping MCV achieve its goal of making Boulder Commons a high-performance building.

“We were thrilled when Pivot Energy stepped up to the challenge of helping engineer and construct the vertical array. Other developers were hesitant to test the waters of designing a vertical facade, but the Pivot team was eager to do whatever it took to help us meet our goals,” said Matthew Beery, MCV’s Director of Construction.

Key players in the design and development of Boulder Commons also see the project as an exciting look at a new paradigm for truly sustainable building design.

“Helping MCV achieve its high-performance energy goals for this unique project was tremendous, and the additional 101 kilowatts on the vertical facade was critical to this outcome. It is estimated that the entire system will save an equivalent of 4,384 metric tons of CO2 over 20 years, which is like taking 953 cars off the road. Boulder Commons again demonstrates how ambitious goals and creative design can unlock a future of truly sustainable buildings,” said Mat Elmore, Pivot Energy’s VP of Business Development.

MCV hopes that the successful completion of this revolutionary project will help other real estate developers recognize that it is possible to achieve sustainable building design with an attractive financial return and keep tenant costs competitive.

Tags: EnergyMorgan Creek VenturesPivot Energysolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
Shell

Shell Started Production at Shell New Energies Junction City

Panasonic Solar Installers

Panasonic Promoted Elite and Premium Solar Installers

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved