Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

NTPC Renewable Energy Invites Bids for 2 MW Green Hydrogen Electrolyser in Chhattisgarh

Palak by Palak
April 28, 2025
in Hydrogen
Reading Time: 1 min read
0
NTPC Renewable Energy
Share on FacebookShare on TwitterShare on Linkedin

NTPC Renewable Energy (NTPC REL) has invited bids for the installation of a 2 MW green hydrogen generation system or electrolyser at Sipat, Chhattisgarh, as part of its green hydrogen mobility project. The final project capacity may vary between 1 MW and 2 MW depending on NTPC REL’s requirements. 

According to the tender guidelines, the bidders are required to submit a security deposit of Rs 2 million. The selected bidders will be responsible for designing, engineering, erecting, testing, and commissioning the hydrogen mobility project. Furthermore, they must handle the delivery and receipt of project equipment and conduct all necessary safety assessments, including the hazard identification and risk assessment study. The last date for bid submission is May 7, 2025.

RELATED POSTS

ITM Power Signs Agreement for Hydrogen Project in the UK

Walplast’s HomeSure MasterTouch WaterLock Sees Strong First-Year Growth

Additionally, the bidders must also finalise the hydrogen generation layout for obtaining approvals from the Petroleum and Explosives Safety Organization and the local administration. The entire project is required to be completed within eight months. According to the eligibility criteria, the bidders must be electrolyser technology providers who were previously selected through an earlier expression of interest issued by NTPC REL and must have signed electrolyser technology provider agreements.

Tags: HydrogenNTPC Renewable EnergyPetroleumTechnology
ShareTweetShare
Palak

Palak

Related Posts

ITM Power

ITM Power Signs Agreement for Hydrogen Project in the UK

by Palak
August 18, 2025
0

ITM Power has signed a supply agreement and binding heads of terms for a long-term services agreement with MorGen Energy...

Mastertouch Waterlock

Walplast’s HomeSure MasterTouch WaterLock Sees Strong First-Year Growth

by Palak
August 13, 2025
0

Mumbai : Walplast Products Pvt. Ltd., has reported an impressive double-digit growth for its recently launched HomeSure MasterTouch WaterLock, an advanced waterproofing...

JSW Energy

JSW Energy Commissions Second 80 MW Unit of Kutehr Hydropower Project

by Palak
August 11, 2025
0

JSW Energy Limited has commissioned the second 80 MW unit of its 240 MW (3×80 MW) Kutehr hydroelectric power plant...

Kosol Energie

Kosol Energie Enters BESS, Green Hydrogen & Ammonia Sector to Boost India’s Clean Energy Transition

by Palak
August 6, 2025
0

Ahmedabad : Kosol Energie has announced a major strategic expansion into Battery Energy Storage Systems (BESS), Green hydrogen, and Green ammonia...

JSW Energy

JSW Energy Commissions First 80 MW Unit of 240 MW Kutehr Hydroelectric Project

by Palak
August 4, 2025
0

JSW Energy Limited has commissioned the first 80 MW unit of its 240 MW (3×80 MW) Kutehr hydroelectric power (HEP)...

Next Post
Reliance

Reliance Launches Solar Manufacturing Line

Iberdrola

Iberdrola and Kansai Seal Deal for 315 MW Baltic Sea Offshore Wind Farm

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

August 18, 2025
ITM Power

ITM Power Signs Agreement for Hydrogen Project in the UK

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

ITM Power Signs Agreement for Hydrogen Project in the UK

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

Offshore Wind Turbine Efficiency Market Projected to Hit $18.7 Billion by 2033

Innovations Driving Growth in the Fire Pump Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved