Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

NTPC Announces Tender for 960 MW Wind Energy Project

editor by editor
July 6, 2024
in Tenders
Reading Time: 1 min read
0
NTPC Renewable Energy Limited
Share on FacebookShare on TwitterShare on Linkedin

NTPC Renewable Energy Limited has issued a request for proposals for the provision and installation of wind turbine generators (WTGs) for 960 MW inter-state transmission system connected wind project, tranche III. To be located in Karnataka, the project consists of two blocks. With a capacity of 492 MW and 468 MW, block I and block II will have 164 WTGs and 156 WTGs, respectively.

The project encompasses the design, engineering, manufacturing, supply, erection, installation, testing, and commissioning of WTGs rated at 3 MW or higher. The bid submission deadline is August 6, 2024.

RELATED POSTS

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

The bidders are accountable for the complete operations and maintenance of the entire system for ten years following the project’s commissioning. This encompasses providing spare parts and consumables, as well as repairing or replacing any faulty equipment. They are required to secure statutory approvals and clearances for power evacuation, grid connectivity, and coordination with state nodal renewable energy agencies, as necessary. The bidders are required to be manufacturers of approved WTGs and have a minimum rating of 3 MW, as specified in the most recent Revised List of Models and Manufacturers issued by the Ministry of New and Renewable Energy.

Tags: NTPCwind energyWind Turbine
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

Next Post
SECI Wind-Solar Hybrid

SECI Calls for Bids on 400 MW Wind-Solar Hybrid Projects

Atlantic Shores

US DOI Greenlights 2.8 GW Atlantic Shores Offshore Wind Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

EV Adoption Accelerates

Key Growth Drivers of the U.S. Charging-as-a-Service Market

June 27, 2025
Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Key Growth Drivers of the U.S. Charging-as-a-Service Market

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

Top 5 Emerging Opportunities in the LDPE Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved