Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

NHPC Issues Tender for 7.6 MW Rooftop Solar Project

Urja Daily by Urja Daily
September 26, 2024
in Solar
Reading Time: 1 min read
0
NHPC Solar
Share on FacebookShare on TwitterShare on Linkedin

NHPC Limited has floated a tender for the development of 7.68 MW grid-connected rooftop solar power systems. This project is being conducted under the PM Surya Ghar: Muft Bijli Yojana. The last date for submission of bids is October 29, 2024. The projects will be implemented in four different zones with different capacities. The allocated zones are Zone 1: Jammu and Kashmir (4,102 Kw); zone 2: Himachal Pradesh (1,710 Kw); zone 3: Uttar Pradesh and Uttarakhand (774 kW); and zone 4: Sikkim, West Bengal, and Manipur (1,098 Kw).

According to the tender guidelines, bidders have to pay Rs 5,000 as document fee in Jammu and Kashmir and Rs 1,500 in the other zones. They must submit an earnest money deposit as a bid security of Rs Rs 4 million for Zone 1, Rs 1.78 million for Zone 2, Rs 805,000 for Zone 3, and Rs 1.14 million for Zone 4. The bidders should have a minimum turnover of Rs 81.2 million for zone 1, Rs 33.8 million for zone 2, Rs 15.3 million for zone 3 and Rs 21.7 million for zone 4. The working capital requirements are Rs 45.1 million, 18.8 million, 8.5 million and 12.1 million for zone 1, 2, 3 and 4 respectively.

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Furthermore, the projects have to be completed within nine months of Notification of Award. The winning bidder will also have to perform the operation and maintenance of the project for five years.

Recently in September 2024, NHPC floated a tender for 1.2 GW Inter-State Transmission System (ISTS)-connected solar power projects with a 600 MW/12,000 MWh energy storage system (ESS). It was also accorded with the Navratna status in the same month. In July 2024, Jakson Green inked a power purchase agreement with NHPC for a 400 MW solar project.

Tags: ESSISTSNHPC Solarpower
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
MERC

MERC Approves 5,991 MW Solar Procurement to Strengthen Renewable Energy in Maharashtra

Apraava Energy

Apraava Energy Secures ISTS Project via TBCB in Rajasthan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved