Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MNRE Issues Clarification on ALMM Order for Solar PV Modules

editor by editor
May 22, 2024
in Solar
Reading Time: 1 min read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has issued an important clarification regarding the Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order, 2019. According to the official memorandum dated May 20, 2024, the order will apply to projects where the final bid submission date is on or after April 10, 2021. For the projects whose last date of bid submission was prior to April 6, 2021, the approved list of models and manufacturers (ALMM) order concerning List I (Modules) shall not be applicable. This measure aims to ensure that solar photovoltaic cells and modules used in government and government-assisted projects adhere to established standards for quality and reliability, thereby safeguarding long-term energy security.

The ALMM order mandates that only models and manufacturers listed and approved under the order are eligible for use in these projects. This clarification is part of ongoing efforts by the MNRE to streamline and reinforce regulations governing the solar energy sector, ensuring that all installations meet necessary quality benchmarks for sustainable energy development.

RELATED POSTS

Eurowind Energy Invests €174.8 Million to Develop 220 MW Solar Park in Romania

Premier Energies Commissions 1.2 GW TOPCon Solar Cell Manufacturing Line in Telangana

Tags: ALMMMNRESolar photovoltaic
ShareTweetShare
editor

editor

Related Posts

Eurowind Energy

Eurowind Energy Invests €174.8 Million to Develop 220 MW Solar Park in Romania

by Palak
June 30, 2025
0

Eurowind Energy will develop a 220 MW solar park in Romania’s Vișina, Dâmbovița County. The total investment in the solar...

Premier Energies

Premier Energies Commissions 1.2 GW TOPCon Solar Cell Manufacturing Line in Telangana

by Palak
June 30, 2025
0

Premier Energies Limited has commissioned a new 1.2 GW tunnel oxide passivated contact (TOPCon) solar cell manufacturing line at its...

Meta

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

by Palak
June 27, 2025
0

Adapture Renewables has executed two environmental attributes purchase agreements (EAPAs) with Meta. The agreements total 360 MW across two solar...

JSW Energy

JSW Energy Inks PPA with NHPC for 300 MW Solar-Wind Hybrid Project

by Palak
June 27, 2025
0

JSW Energy Limited, through it’s subsidiary Energizent Power Private Limited has signed a power purchase agreement (PPA) with NHPC Limited...

Solar Pumps

Solar Pumps Surge Ahead: Fueling the Future of Sustainable Water Solutions

by Palak
June 25, 2025
0

As the world embraces clean and renewable energy sources, solar-powered technologies are stepping into the spotlight like never before. Among...

Next Post
Sarawak-Singapore Electricity

Sarawak-Singapore Electricity Project to Begin Operations by 2031

Enfinity Global

Enfinity Global Secures $135M Financing for 1.2 GW Solar and Wind Projects in India

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Electric Vehicle Market

Electric Vehicle Market

June 30, 2025
LEAP24

LEAP24 Speeds Up London EV Charging Expansion with Four New Ultra-Rapid Sites in One Week

June 30, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Electric Vehicle Market

LEAP24 Speeds Up London EV Charging Expansion with Four New Ultra-Rapid Sites in One Week

Eurowind Energy Invests €174.8 Million to Develop 220 MW Solar Park in Romania

Egypt’s AMEA Power Achieves Financial Closure for 300 MWh BESS Project

Arevon Begins Operations of 200 MW Energy Storage Project in San Diego

Cummins India Launches Battery Energy Storage System to Support Clean Energy Transition

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved