Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

MNRE has issued Guidelines for Procuring Power From Solar Projects

Urja Daily by Urja Daily
October 8, 2020
in News
Reading Time: 2 mins read
0
MNRE has issued Guidelines for Procuring Power From Solar Projects
Share on FacebookShare on TwitterShare on Linkedin

MNRE has issued amendments to the guidelines for the tariff-based bidding process for the procurement of power from grid-tied solar projects.

The Ministry of New and Renewable Energy (MNRE), in a gazette notification, has issued amendments to the guidelines for ‘Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects

RELATED POSTS

ISL 2026-27 to be known as the MG Indian Super League

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

The successful bidder, if being a single company or consortium, shall ensure that its/ their shareholding in the SPV/project company executing the PPA shall not fall below 51 percent at any time prior to 1 year from the COD [earlier 3 years], except with the prior approval of the Procurer. Further, the successful bidder shall ensure that its promoters shall not cede control2 of the bidding company/ consortium till 1 year [earlier 3 years] from the COD, except with the prior approval of the Procurer. In this case, it shall also be essential that the successful bidder shall provide the information about its promoters and their shareholding to the Procurer before signing of the PPA with the Procurer.

Quantum of Earnest Money Deposit (EMD)

Quantum of the EMD in the form of a bank guarantee/ letter of undertaking to pay/ payment of order instrument, [earlier only bank guarantee] to be furnished by the bidders. The EMD shall stand forfeited in the event of failure of the Solar Power Generator to execute the PPA within the stipulated time period.

Guarantees

The Solar Power Generator shall provide the following guarantees to the Procurer in terms of the RfS and the PPA:

Earnest Money Deposit (EMD), to be fixed by the Procurer, [but not to be more than 2 percent of the estimated capital cost of the solar PV power project cost, as determined by CERC, if any, for the financial year in which the bids are invited or the estimated project cost], to be submitted

In its new amendments, the Ministry has mentioned that “these Letter(s) will have the same effect as that of a Bank Guarantee issued by any public sector bank. Such “Payment on Order instrument” would have terms and conditions similar to that of any Bank Guarantee given by any public sector bank and would promise to pay the Procurer on-demand within the stipulated time. Solar power generators can seek such Letters(s) by offering due security to the above mentioned three non-banking financial institutions mentioned above (IREDA, PFC & REC). Procurer(s) shall not accept the instrument of ‘Letter of Undertaking’ as described above or in any other form, from any other non-banking financial institutions or bank, except IREDA, PFC & REC.”

These letter(s) will also be accepted as Performance Bank Guarantee(s). And hence, the ministry has stated that Performance Bank Guarantee (PBG) wherever mentioned in the bidding process guidelines shall be referred to as Performance Guarantee (PG) in the form of Bank Guarantee or alternatives provided thereto as per these Guidelines.

Tags: Bank Guaranteebidding processEMDGuidelinesIndiaMNREMNRE Guidelines Solar PowerSolar EnergySolar Power
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

MG Indian Super League

ISL 2026-27 to be known as the MG Indian Super League

by Urja Daily
October 2, 2026
0

National : The Indian Super League (ISL) today announced its partnership with JSW MG Motor India for the Title Sponsor of...

KP 3.0

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

by Urja Daily
October 1, 2026
0

Mumbai : KP Group unveiled KP 3.0 at its Investor Day and announced revised commitments for FY32. The Group is...

ASDC Champions Shine

ASDC Champions Shine at WorldSkills Shanghai 2026; Secure 5 Medals for Excellence

by Urja Daily
October 1, 2026
0

NEW DELHI: Marking a major triumph for India’s automotive skill ecosystem, competitors supported and prepared by the Automotive Skills Development Council...

honeywell

Honeywell Technologies Partner with Dangote to Accelerate Refinery Development

by Urja Daily
October 1, 2026
0

BENGALURU, India – Dangote Petroleum Refinery and Petrochemicals FZE has selected Honeywell Technologies to provide process technologies, licensing, engineering services, proprietary catalysts, equipment...

Fujitsu

Tomoshia Holdings, Fujitsu Begin Major “TO-One” Core System Transformation

by Urja Daily
September 29, 2026
0

Tokyo and Kawasaki, Japan - TOMOSHIA HOLDINGS CO., LTD. and Fujitsu Limited today announced the launch of "TO-One (Tomoshia Operations as...

Next Post
Tata-Steel-to-Collaborate-with-CSIR-to-Deploy-Decarbonization-Technologies

Tata Steel to Collaborate with CSIR to Deploy Decarbonization Technologies

Floating-Solar-in-Hydropower-Projects-Could-Generate-7.6-TW-of-Energy-Annually

Floating Solar in Hydropower Projects Could Generate 7.6 TW of Energy Annually

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

MG Indian Super League

ISL 2026-27 to be known as the MG Indian Super League

October 2, 2026
Thousand Trails

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

October 2, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

ISL 2026-27 to be known as the MG Indian Super League

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

ASDC Champions Shine at WorldSkills Shanghai 2026; Secure 5 Medals for Excellence

Honeywell Technologies Partner with Dangote to Accelerate Refinery Development

Yash Highvoltage Expands US Footprint to 22 States with New Midwest Partnership

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved