Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

ChargeNet and 3Degrees Collaborate to Launch EV Charging Stations

Urja Daily by Urja Daily
October 18, 2022
in News
Reading Time: 2 mins read
0
Chargenet and 3Degree
Share on FacebookShare on TwitterShare on Linkedin

SAN FRANCISCO : ChargeNet Stations opened the first DC fast charging station in a rapidly expanding network of electric vehicle (EV) chargers at quick-serve restaurants across California. The leading DC fast charging network developer is celebrating its first operational station at a South San Francisco Taco Bell® location. ChargeNet Stations has a partnership with Diversified Restaurant Group, one of the largest Taco Bell franchisees, to install DC fast chargers at 100 locations throughout the state, with many additional stations planned. The agreement includes the installation of primarily 75kW and 100kW chargers, with plans to roll out 150kW stations as well.

3Degrees, a firm that helps organizations around the world achieve renewable energy and decarbonization goals, worked with ChargeNet Stations to develop an innovative financing approach that guarantees the company a minimum amount of value from its first 25 public charging stations for the next five years. This strategy leverages California’s Low Carbon Fuel Standard (LCFS), a program designed to reward the deployment of equipment and infrastructure that reduces transportation emissions in the state.

RELATED POSTS

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

“Our goal at ChargeNet Stations is to make EV available to everyone everywhere – to democratize EV charging by providing a fast, convenient, and affordable charge,” said Founder and CEO Tosh Dutt. “Great partners like 3Degrees help us expedite our mission. It’s good for the planet and it’s good for business.”

ChargeNet Stations is compatible with all EV connector types and offers a 100-mile charge in 20 minutes, or less, for about $20. For context, a 100-mile charge on a Level 2 charger would take about six hours.

Transportation is California’s largest source of greenhouse gas emissions, representing 41% of the state’s total1. The LCFS was launched in 2011 to reduce emissions from this hard-to-abate sector. The program allows companies using, producing, or furthering the use of low carbon fuels to generate credits to be sold at market-value to fossil fuel producers. The program also incentivizes the deployment of DC fast chargers by providing a guaranteed minimum number of LCFS credits for the first 5 years of the station’s life, reducing concerns around infrastructure utilization.

The program does not, however, guarantee the price of the credits generated from this infrastructure, and the LCFS market has been particularly volatile of late, dropping from ~$150 at the start of the year to lows of ~$60 in early October. Despite this state of flux in the market,

“Meeting California’s EV adoption and transportation decarbonization goals requires mass deployment of EV charging infrastructure,” notes Dave Meyer, Director, Transportation Markets at 3Degrees. “One of the primary barriers to this deployment is uncertainty around utilization. The infrastructure provisions of the LCFS reduce this uncertainty, and our innovative financing arrangement eliminates market uncertainty. We congratulate the ChargeNet Stations team on this first station opening and look forward to working together on many more.”

Tags: ChargeNetelectric vehicleEVfast chargingTaco Bell
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

by Urja Daily
November 12, 2026
0

Problem gambling affects millions of people worldwide, causing financial difficulties, relationship strain, and severe mental health challenges. non GamStop UK...

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

STMicroelectronics

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

by Urja Daily
November 12, 2026
0

One unified STM32 platform enables customers to reuse architectures, IP, software and tools across industrial, automotive, and robotics applications The new...

Link Factory verification

by Urja Daily
November 11, 2026
0

verification

Next Post
Hopium Machina Vision

Hopium unveil at Paris Automotive Week, The Hopium Machina Vision

Ankit Mittal - Co-founder and CEO

Effect of amended Battery Safety standards norms to avoid EV Fires

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved