Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MAHAPREIT Issues Tender for 500 MW Rooftop Solar Projects Across Five Indian States

Palak by Palak
June 20, 2025
in Solar
Reading Time: 2 mins read
0
MAHAPREIT
Share on FacebookShare on TwitterShare on Linkedin

Mahatma Phule Renewable Energy and Infrastructure Technology (MAHAPREIT) has issued a request for proposal to implement 500 MW of rooftop solar projects with a 50 per cent greenshoe option across multiple locations in Maharashtra, Goa, Gujarat, Uttar Pradesh, and Andhra Pradesh. The projects are divided into four categories based on the approved demand of micro, small and medium enterprises (MSMEs): A1 (20 kW to 100 kW), A2 (101 kW to 250 kW), A3 (251 kW to 1,000 kW), and A4 (above 1,000 kW), with each category being allotted a capacity of 125 MW. The estimated cost per MW is Rs 37.5 million. 

According to the tender guidelines, the scope of the project includes the design, engineering, financing, supply, installation, testing, and commissioning of rooftop solar systems. The projects must be connected to existing mains/AC distribution box and integrated with internal electrical loads and the network of the distribution licensee. Only components listed in the Approved List of Models and Manufacturers are to be used. The selected bidders will also be responsible for comprehensive operations and maintenance (O&M) services for 20 years. Additionally, all the associated works related to project commissioning and O&M must be carried out by the developer. The completion timeline for the projects is 12 months from the award date. The bidders must submit a bid security amount of Rs 225,000. The deadline for bid submission is July 15, 2025. 

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

According to the eligibility criteria, the bidders must be a body corporate incorporated in India, a partnership firm, a limited liability partnership firm, or a registered sole proprietor. For A1, the bidders must have commissioned solar projects with a cumulative capacity above 200 kW, including at least one project of over 20 kW capacity. For A2, the cumulative capacity must exceed 500 kW, including at least one project of over 100 kW capacity. For A3, the requirement is over 1 MW cumulative capacity and at least one project above 100 kW capacity. For A4, bidders must have implemented over 2 MW in total, including one project above 500 kW and two others with a capacity of more than 250 kW each. All referenced projects must have been operational for at least one year. Additionally, the bidders must have executed projects covering at least 30 per cent of the tendered capacity They should also have a minimum net worth of Rs 2.5 million per MW or an annual average turnover of Rs 10 million per MW over the past three years.

Tags: MAHAPREITmaintenanceoperationRenewable EnergySecuritysolarTechnology
ShareTweetShare
Palak

Palak

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
Juniper Green Energy

Juniper Green commissions 59 MWp solar unit of hybrid project in Maharashtra

California Energy

California Energy Commission Approves Solar-plus-Storage Project in Fresno County

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved