Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

KPI Green Energy Starts Electricity Supply from 200 MWac Solar Power Plant

Palak by Palak
January 30, 2026
in Power, Solar
Reading Time: 1 min read
0
KPI Green Energy
Share on FacebookShare on TwitterShare on Linkedin

KPI Green Energy Limited has begun generating and supplying power from its 200 MWac/240 MWdc grid-connected solar power project in Khavda. The project was secured from Gujarat Urja Vikas Nigam Limited, which is also the project’s offtaker. The project has achieved grid synchronisation, with initial power injected into the state grid.

Furthermore, the project is being executed under a long-term power purchase agreement and aligns with Gujarat’s efforts to scale up renewable energy capacity and strengthen grid reliability. Additionally, it is among the first solar projects to be commissioned at the 1.8 GW GSECL Solar Park (South Block) in Khavda.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Earlier in December 2025, KPI Green Energy Limited secured a work order worth approximately Rs 4.89 billion from Gujarat State Electricity Corporation for the engineering, procurement, and construction of a 142 MWp/110 MWac floating solar photovoltaic project.

Tags: ElectricityKPI Green Energypowersolar
ShareTweetShare
Palak

Palak

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
EcoCeres

EcoCeres Brings 420,000 TPA Renewable Fuels Capacity Online in Malaysia

NextPower

NextPower Arabia Secures Tracker Supply Contract for Bisha Solar Plant

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved