Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

JERA Nex Acquires Two U.S. Solar Farms from Lightsource BP

editor by editor
August 9, 2024
in Solar
Reading Time: 1 min read
0
JERA Nex
Share on FacebookShare on TwitterShare on Linkedin

JERA Nex has purchased two US solar projects with a combined capacity of 395 MW from Lightsource bp. The transaction has gained all regulatory clearances, is JERA Nex’s first since its establishment in April. It includes its first US solar assets: the 300 MW Oxbow solar farm in Louisiana and the 95 MW Happy solar farm in Arkansas.

Furthermore, both the plants are commercially operational and provide renewable energy to their clients. The Happy project has secured a long-term power purchase agreement with Conway Corp, the city’s utility company in Conway, Arkansas. Oxbow has signed long-term PPA deals with McDonald’s and eBay. As part of the deal, Lightsource bp will continue to give asset management and operation and maintenance services to JERA Nex.

RELATED POSTS

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

In April 2024, JERA Nex and Alinta Energy agreed to jointly develop the 1 GW+ Spinifex Offshore Wind Farm in the Southern Ocean Region Declared Area in South West Victoria. Under the agreement Alinta Energy and JERA Nex, will apply their respective expertise and capabilities to jointly develop the Spinifex Project.

Tags: Alinta EnergyJERA NexLightsource BPsolar
ShareTweetShare
editor

editor

Related Posts

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

by Palak
September 5, 2025
0

New Delhi : Shweta Solar Pvt. Ltd. (Shweta Solar) is all set to launch a new 1.2 GW solar module manufacturing...

IGL and RVUNL

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

by Palak
September 3, 2025
0

Indraprastha Gas Limited (IGL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL) have inked a joint venture (JV) agreement to...

Premier Energies

Premier Energies Bags ₹27.03 Billion Orders for Solar Modules and Cells

by Palak
September 2, 2025
0

Premier Energies Limited has secured orders worth Rs 27.03 billion for the supply of solar photovoltaic modules and cells with...

GH2 Solar

GH2 Solar, AHES to Establish Electrolyser Manufacturing Facility in Madhya Pradesh

by Palak
September 2, 2025
0

GH2 Solar Limited, in a joint venture with Advanced Hydrogen Energy Solutions (AHES) Limited, will set up an electrolyser manufacturing...

Thailand Floating Solar

Thailand Issues Tender for 364 MW Floating Solar Project

by Palak
September 2, 2025
0

The Electricity Generating Authority of Thailand (EGAT) has invited bids for the Srinagarind Dam floating solar project 3 in Thailand....

Next Post
Tata Power

Tata Power Plans to Acquire 40% Stake in KHPL

Suzlon

Suzlon Set to Acquire 76% Stake in Renom Energy Services

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

September 5, 2025
Powering India's Future

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

September 5, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

The Hype Studio Partners with Kaydence Media Ventures to Boost Advocacy and PR Leadership

What’s Holding Back the EV Battery Revolution?

Zaggle and Standard Chartered Partner to Revolutionize Corporate Spend Management

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved