Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Italy Auctions 7.4 GW of Solar and 940 MW Wind Projects

Palak by Palak
December 8, 2025
in Solar, Wind
Reading Time: 1 min read
0
Italy solar and wind
Share on FacebookShare on TwitterShare on Linkedin

Italy’s energy management agency has released the results for the competitive procedures for wind and solar projects under the FER-X Transitory decree. A total of around 940 MW has been allocated to 29 wind projects, with a weighted average award price of €72.851 per MWh, reflecting an average reduction of 19.67 per cent. Additionally, approximately 7,700 MW has been awarded to 474 solar projects, with a weighted average award price of €6.825 per MWh, marking an average reduction of 37.34 per cent.

The ceiling tariffs were set at €77.738 per MWh for wind and €62.675 per MWh for solar. Most permitted solar projects involved new construction, while nearly one-third of permitted wind project applications involved complete refurbishments, representing over half of the admitted wind capacity. In the  solar segment, a notable share of withdrawals involved projects that had either submitted expressions of interest for the FER-X NZIA call or had been accepted under the agrivoltaic development measure. Additionally, for all projects admitted to a valid ranking position, the publication of results constitutes formal confirmation, triggering the 36-month deadline for commissioning as stipulated under the decree.

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Applications for the support mechanism must be submitted through the FER-X portal within 90 calendar days from the date the project becomes operational, failing which the project will lose the awarded tariff and the deposit enforced. Moreover, the agency will announce separately the opening date for the portal functionality. For plants already operating, the 90-day submission timeline will begin from that announced date.

Tags: Renewable EnergysolarWind
ShareTweetShare
Palak

Palak

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
TPREL

TPREL Signs MoU with UCO Bank to Boost Rooftop Solar Deployment in India

EDF

EDF, Partners Secure Funding for 124 MW Wind Project in Canada

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved