Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

IIT Jodhpur Invited Online Bids for Off-Grid Solar PV Power Plant

Urja Daily by Urja Daily
May 28, 2021
in Tenders
Reading Time: 1 min read
0
IIT JODHPUR
Share on FacebookShare on TwitterShare on Linkedin

Indian Institute of Technology Jodhpur, an Educational Institute of National Importance, invites online Bids in two-bid format for supply and installation of “Off-Grid Solar Photovoltaic (PV) Power Plant” at the Institute as per the technical specifications given in the Annexure-I to the Tender form. All offers should be made in English and should be written in both figures and words. Tender forms can be downloaded from the CPP Portal (http://eprocure.gov.in/eprocure/app) & Institute website http://www.iitj.ac.in/tenders/index.php?id=equipment. The bidders are requested to read the tender document carefully and ensure compliance with all specifications/instructions herein. Non-compliance with specifications/instructions in this document may disqualify the bidders from the tender exercise. The Director, IIT Jodhpur reserves the right to select the item (in single or multiple units) or to reject any quotation wholly or partly. Incomplete tenders, amendments and additions to tender after opening or late tenders are liable to be ignored and rejected.

For more information : click here

RELATED POSTS

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

Tags: IIT JodhpurOff-GridSolar PV Power Planttender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

Next Post
BHEL

Supply for Module Washing System for 100MW Solar Power Plant at NTPC, Ramagundam

Wind Power Project

Setting Up of 1200 MW ISTS -Connected Wind Power Projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved