Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

HyperloopTT Moves to Italy

Urja Daily by Urja Daily
February 23, 2024
in News
Reading Time: 3 mins read
0
HyperloopTT
Share on FacebookShare on TwitterShare on Linkedin

Hyperloop Transportation Technologies “HyperloopTT” the world’s leading company in developing the next generation of sustainable high-speed travel, announced today a company move from the research and development center in Toulouse, France to Italy. Toulouse laid the groundwork for what was ultimately HyperloopTT’s winning bid for the Italian tender in 2023. In January 2024 the contract for Hyper Transfer was signed, officially starting the project.

HyperloopTT will open new offices outside Venice with additional operations at HyperloopTT’s longtime research partner the Polytechnic of Turin and alongside Hyperloop Italia’s office in Puglia. The capsules, vacuum pumps, control center and levitation and propulsion systems will all be transported to Italy. HyperloopTT personnel local to Toulouse will continue to work on Hyper Transfer and other projects.

RELATED POSTS

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Since opening the Toulouse facility at the Francazal airport in 2017, HyperloopTT has contributed millions of dollars to the local Toulouse economy, hosted global transportation leaders from the US Department of Transportation, European Commission, and Italy’s Hyper Transfer Consortium, and achieved a multitude of critical testing milestones including:

  • 320-meter test track with full-scale tubes and pylons manufactured and assembled
  • Depressurization of track to pressure lower than 0,1 mbar (10 Pa)
  • Repressurization systems with electropneumatic valves on tube
  • Tube air leakage and energy measurement to adjust and maintain the low pressure
  • Propulsion control test using small-scale embedded magnets with a full-scale Linear Synchronous Motor (LSM) and associated power electronics
  • Magnetic Levitation tests
  • Linear Motor Heat dissipation test in vacuum test bench
  • Development of an Operations Control Center (OCC) with Human-Machine Interfaces (HMIs) to control tests directly linked to a safety-certified controller, for integration with partner systems
  • Integration of Traffic Management System developed in partnership with Hitachi Rail

All these milestones were achieved working with over twenty local and regional companies, universities, and other organizations.

Andrés de León, HyperloopTT CEO said:

“We want to thank the mayor, authorities, and community of Toulouse for their support over the past few years. While our progress has not always been consistent, it has always been forward. It became clear to us a few years into our development that the land required to take the next steps with hyperloop certification could not be met at Francazal and so we began searching for a bigger test site that could support the tens of kilometers needed to achieve our goals. We would not be where we are today, including signing the world’s first commercial hyperloop system contract with Italy, without the important groundwork we achieved in Toulouse.”

HyperloopTT began the dismantling of the company’s first track in Toulouse in February and expects to complete the move to Italy within the next six months.

Tags: HyperloopHyperloopTTTransportation Technologies
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

by Urja Daily
November 12, 2026
0

Problem gambling affects millions of people worldwide, causing financial difficulties, relationship strain, and severe mental health challenges. non GamStop UK...

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

STMicroelectronics

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

by Urja Daily
November 12, 2026
0

One unified STM32 platform enables customers to reuse architectures, IP, software and tools across industrial, automotive, and robotics applications The new...

Link Factory verification

by Urja Daily
November 11, 2026
0

verification

Next Post
ReVision Energy

ReVision Energy Starts Construction on NH's First Utility-Owned Solar Project

Yara for green ammonia

Clearway Energy Completes 1.1M Panel Solar Project in Texas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved