Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Hartek Solar to Build 2 MW Floating Solar Plant

Urja Daily by Urja Daily
October 12, 2022
in News, Renewable, Solar
Reading Time: 1 min read
0
Floating Solar
Share on FacebookShare on TwitterShare on Linkedin

Hartek Solar has bagged an order for a 2000 KW Floating Solar Plant from Chandigarh Renewal Energy and Science & Technology Promotion Society (CREST).

The Foundation stone for the Project was laid down by the Hon’able President of India Smt Droupadi Murmuru ji on 9th October 2022 in Chandigarh.

RELATED POSTS

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

The 2 MW floating solar plant is claimed to be the largest floating solar power plant to set up in North India. The plant will be situated at Sector 39 Water Works, that supplies water to the entire Chandigarh city. This 2000 KW project will generate 28,00,000 units of electricity per year and will contribute in saving 80000 tonnes of CO2.

On this occasion, Director and CEO of Hartek Solar, Mr. Simarpreet Singh said “It is a matter of honour and pride that the foundation stone has been laid by the Hon’able President of India. It is truly a historic moment for us. I would like to thank CREST and entire Chandigarh administration for showing their trust on us. We will continue to work for Nation Building and a Sustainable Future for the times to come�

Tags: Floating SolarHartek SolarRenewal EnergyRooftop Solar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

by Urja Daily
November 12, 2026
0

Problem gambling affects millions of people worldwide, causing financial difficulties, relationship strain, and severe mental health challenges. non GamStop UK...

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

Renewable Energy

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

by Urja Daily
November 12, 2026
0

The Telangana Electricity Regulatory Commission (TGERC) has granted in-principle approval to state distribution companies, Telangana State Southern Power Distribution Company...

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Next Post
Shanghai Electric

Shanghai Electric Opened Block B in Phase Five of MBR Solar Park in Dubai

Ivan Contreras CEO of eBikeGo

eBikeGo appointed Ivan Contreas CEO

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved