Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

GUVNL Reveals Auction Results for 500 MW Solar Projects

Urja Daily by Urja Daily
December 19, 2024
in Solar
Reading Time: 1 min read
0
GUVNL
Share on FacebookShare on TwitterShare on Linkedin

Gujarat Urja Vikas Nigam Limited (GUVNL) has announced the winners of its 500 MW grid-connected solar power projects (Phase XXV) with an additional greenshoe option of 500 MW. The tender was issued in August 2024. 

Prozeal Green Energy, Kintech Synergy, Ausom Enterprise, Enertech Fuel Solutions, S.B.B. Mouldings, and Drashta Green Power secured capacities of 100 MW, 50 MW, 50 MW, 40 MW, 10 MW, and 10 MW, respectively, at a tariff of Rs 2.55 per kWh. SAEL was awarded 240 MW out of its quoted capacity of 300 MW at Rs 2.56 per kWh through the bucket-filling method. Kintech, Enertech, Drashta, and SAEL accepted greenshoe capacities of 50 MW, 203 MW, 7 MW, and 240 MW, respectively, at a tariff of Rs 2.55 per kWh. 

RELATED POSTS

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

Eligible projects included those under construction, yet to be commissioned, or already commissioned but without a long-term power purchase agreement with any entity. These projects were required to have no obligations under other central or state programmes and no commitments to existing buyers. 

GUVNL mandated that all projects utilise solar modules listed in the Approved List of Models and Manufacturers issued by the Ministry of New and Renewable Energy. Solar projects could be set up within existing grid-connected wind farms if spare capacity was available for renewable energy integration at the Gujarat Energy Transmission Corporation or central transmission utility substations. 

In December 2024, GUVNL announced the results of its 500 MW/1,000 MWh standalone battery energy storage systems (BESS) Phase IV auction, with H.G. Infra Engineering, Advait Infratech, Kintech Synergy and Bhilwara Energy emerged as the winners. 

Tags: BESSGUVNLpowerRenewable Energysolar
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

by Urja Daily
October 23, 2026
0

For Indian industries, investing in solar power has become an important step towards controlling electricity costs and meeting sustainability goals....

Fujitsu

Fujitsu and Research Partners Develop Automated Parameter Optimization for Solar Energetic Particle Simulations

by Urja Daily
October 21, 2026
0

Kawasaki, Nagoya, Yokosuka and Tokyo, Japan - Fujitsu Limited (Fujitsu), Nagoya University, Tokai National Higher Education and Research System (Nagoya University),...

VIKRAM SOLAR

Vikram Solar to establish 7.5 GWh BESS plant in Tamil Nadu

by Urja Daily
October 21, 2026
0

VSL PowerHive, a wholly owned subsidiary of Vikram Solar, has announced plans to establish a 7.5 GWh battery energy storage...

Vikram Solar

Vikram Solar secures 187 MW module supply order in Karnataka and Tamil Nadu

by Urja Daily
October 20, 2026
0

Vikram Solar has secured a 187 MW module supply order from a leading renewable energy developer in India for solar...

Techzeal

Techzeal Info Pvt. Ltd. is Set to Execute Next-Phase Growth Strategy, Expanding Beyond Conventional Solar EPC

by Urja Daily
October 19, 2026
0

Mumbai, Maharashtra, India - Techzeal Info Private Limited is preparing for a major transformation of its business model, with plans...

Next Post
JVVNL

JVVNL Seeks Bids for 238.4 MW Solar Projects Under PM-KUSUM

NTPC Renewable Energy

CIP Acquires Majority Stake in ABO Energy's Wind and Hydrogen Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved