Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Gujarat Commission’s Tariff Decision for 200 MW Wind Solar Hybrid Projects

editor by editor
July 9, 2024
in Solar, Wind
Reading Time: 1 min read
0
Gujarat Wind Solar
Share on FacebookShare on TwitterShare on Linkedin

The Gujarat Electricity Regulatory Commission (GERC) has set the tariffs determined through the competitive bidding process conducted by Gujarat Urja Vikas Nigam (GUVNL) for procuring 200 MW of wind-solar hybrid power from projects to be established anywhere in India. A tariff of Rs 2.99 per kWh for KPI Green Energy’s 50 MW hybrid project and Rs 3.04 per kWh for Juniper Green Energy’s 150 MW hybrid project have been approved by commission. It also granted GUVNL the authority to execute power purchase agreements with the developers.

In June 2024, the GERC approved the tariffs determined through competitive bidding conducted by GUVNL for the procurement of 1,125 MW of solar power from projects to be developed in Gujarat State Electricity Corporation’s solar park at Khavda. In the same month, Essar Group planned to invest Rs 300 billion over the next four years in setting up a green hydrogen plant at Jamnagar in Gujarat.

RELATED POSTS

SAEL bags solar module supply order from NTPC REL

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

Tags: GERCGujaratGUVNLpowersolarWind
ShareTweetShare
editor

editor

Related Posts

SAEL

SAEL bags solar module supply order from NTPC REL

by Palak
July 14, 2026
0

SAEL Solar P6 Private Limited, a subsidiary of SAEL Industries Limited, has secured a letter of award from NTPC Renewable...

GUVNL

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

by Palak
July 13, 2026
0

Gujarat Urja Vikas Nigam Limited (GUVNL) has announced the winners of its auction to procure power from 250 MW of...

Delta Electronics India

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

by Palak
July 11, 2026
0

India's wind sector is crossing a meaningful manufacturing milestone. For years, much of the critical equipment inside turbines—especially converters that...

NTPC

NTPC Green Energy Limited Commissions 50.4 MW Vanki Wind Project in Gujarat

by Palak
July 10, 2026
0

NTPC Green Energy Limited (NGEL) has declared the commercial operation of the first part capacity of 50.4 MW of the...

Sunsure Energy

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

by Palak
July 9, 2026
0

Sunsure Energy has secured Rs 2.62 billion debt financing from FMO, the Dutch entrepreneurial development bank, and Axis Bank for...

Next Post
Servotech Power Systems

Servotech Power Systems Launches Subsidiary for Sports and Entertainment

Energy Development Corporation

EDC Launches 29 MW Palayan Bayan Geothermal Power Plant

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved