Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Gensol Expands GUVNL’s BESS Project with 500 MWh Addition

editor by editor
June 21, 2024
in News
Reading Time: 1 min read
0
Gensol Engineering Limited
Share on FacebookShare on TwitterShare on Linkedin

Gensol Engineering Limited has been awarded an additional 250 MW/500 MWh through the greenshoe option, expanding their standalone battery energy storage systems (BESS) project to a total of 500 MW/ 1,000 MWh.

The project awarded by Gujarat Urja Vikas Nigam Limited (GUVNL), comprising both first and second tranche, is expected to generate total revenue of Rs 26.85 billion over the 12-year battery energy storage purchase agreement duration. The project will provide power on an on-demand basis to state discoms of Gujarat during peak and off-peak hours, thereby extending the availability of renewable energy beyond solar hours. It will fulfill energy storage purchase obligations and improve grid resilience. Once operational at two Gujarat Energy Transmission Corporation substations, the project will provide 500 MW/1,000 MWh of energy through two charge/discharge cycles daily.

RELATED POSTS

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

Tags: BESSGensolGUVNL
ShareTweetShare
editor

editor

Related Posts

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

by Urja Daily
November 12, 2026
0

India’s automotive industry is re-engineering its products and processes around electrification, software, artificial intelligence and automation. Yet workforce capability is...

Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

by Urja Daily
November 12, 2026
0

FORT COLLINS, Colo. —Ampt’s new Battery Converter helps AI data centers run more compute per megawatt of grid capacity as...

STMicroelectronics

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

by Urja Daily
November 12, 2026
0

One unified STM32 platform enables customers to reuse architectures, IP, software and tools across industrial, automotive, and robotics applications The new...

Link Factory verification

by Urja Daily
November 11, 2026
0

verification

Complete Vavada Sign Up Guide and Player Benefits

by Urja Daily
November 11, 2026
0

Creating a new account is the first step toward exploring a massive collection of online games, and completing your Vavada...

Next Post
RoW Damage Compensation

MoP Releases Guidelines for RoW Damage Compensation

Vipin Tiwari

Empowering India: The Rise of Solar Panels and Rooftop Solar in Residential Communities

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026
Ampt

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

STM32 Summit 2026: STMicroelectronics announces its unified MCU platform, addressing technology convergence across industrial, automotive and physical AI applications

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved