Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Gensol Engineering secures 100 MW AC solar project in Maharashtra

editor by editor
March 27, 2024
in Solar
Reading Time: 1 min read
0
Gensol
Share on FacebookShare on TwitterShare on Linkedin

Gensol Engineering Limited has declared that it has secured its largest-ever turnkey (engineering, procurement, and construction) contract in terms of both size and worth from a prominent power generation utility in Maharashtra. The project entails establishing a 100 MWAC (135 MWp) ground-mounted solar photovoltaic power project spanning 500 acres in the state. The project has a total contract value of Rs 5.2 billion.

Gensol will offer comprehensive solutions for the project, encompassing work ranging from land acquisition to design, engineering, procurement, logistics, civil and electrical engineering works, obtaining necessary permits, and the installation and commissioning of the plant. The project scope also entails operational management for a period of three years, including maintenance for both switchyard and extensive transmission infrastructure of the project. The project must be completed within 450 days of receiving the work order.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

In February 2024, Gensol Engineering declared that it secured EPC contracts for two solar projects with a combined capacity of 422.5 MW DC. In the same month, Gensol Engineering Limited successfully secured a substantial Rs 9 billion in equity capital through the issuance of convertible warrants on a preferential basis.

Tags: GensolinfrastructureMaharashtrapowersolar
ShareTweetShare
editor

editor

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
EVNNPT

EVNNPT Launches 500 kV Quang Tri Substation Project in Vietnam

Mahindra and Adani

Mahindra and Adani Total Energies E-Mobility forge partnership to expand EV charging infrastructure

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved