Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

CPCB issues guidelines for storage and handling solar PV waste

Palak by Palak
March 16, 2026
in Storage
Reading Time: 2 mins read
0
CPCB
Share on FacebookShare on TwitterShare on Linkedin

The Central Pollution Control Board (CPCB) has issued Guidelines for Storage and Handling of Waste Solar Photo-Voltaic Modules or Panels or Cells, version 1.0, under the E-Waste (Management) Rules, 2022. The guidelines aim to provide technical guidance on the transport, handling, and storage of waste solar photovoltaic (PV) panels, modules, or cells. They also cover their components, consumables, parts, and spares. The guidelines seek to ensure environmentally sound management to protect human health and the environment and apply to producers, manufacturers, and recyclers of such solar waste.

According to the guidelines, solar waste must not be disposed of or dumped in open areas or landfills, as it may lead to the release of toxic chemicals into the environment. Waste solar modules intended for recycling should be handed over only to registered e-waste recyclers. However, for the purpose of collection and storage, the waste may also be handed over to registered producers and manufacturers. Furthermore, after assessment of the storage requirements, producers and manufacturers should establish a collection mechanism from consumers or bulk consumers, which may include take-back arrangements through different stakeholders. They are also required to publicise their collection systems, including details of collection points and take-back schemes for solar waste.

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

In addition, the guidelines also specify measures for the safe storage and handling of waste solar panels, cells, or modules. Such should be stored in a manner that prevents breakage and ensures the safety of workers handling such materials. Contact with sharp objects or collisions should be avoided to prevent damage to the internal modules. The waste should also be stored in a way that does not affect its potential end use, such as reuse after refurbishing or recycling and recovery, while ensuring no harm to human health, the environment, or the product itself. Moreover, solar waste should be stored in covered sheds or spaces, with the storage area maintained in a dry and well-ventilated condition.

Tags: CPCBPV solarStorage
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
DCM Shriram

DCM Shriram approves Rs 870 million investment for 98.4 MW renewable energy project in Gujarat

Advait Greenergy

Advait Greenergy inaugurates 30 MW alkaline electrolyser assembly facility in Gujarat

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

August 3, 2026
Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Brookfield Launches Renewable Energy Platform Lumara

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved