Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Ceigall India Wins ₹1,700 Crore Solar-BESS Project in MP

Palak by Palak
February 10, 2026
in Solar
Reading Time: 2 mins read
0
Ceigall India
Share on FacebookShare on TwitterShare on Linkedin

National : Ceigall India Limited has received a Letter of Award (LOA) dated 09 February 2026 from Rewa Ultra Mega Solar Limited (RUMSL) for the development of Unit 1 (220 MW) at Morena Solar Park, Madhya Pradesh.

The project, awarded on a tariff-based competitive bidding mechanism, comprises a 220 MW Solar Power Project integrated with a Battery Energy Storage System (BESS). The tariff quoted for the project is ₹2.70 per kWh, with an approximate project value of ₹1,700 crore (including GST).

RELATED POSTS

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

The construction period for the project is 24 months, followed by an operational period of 25 years. The project is expected to contribute significantly to Madhya Pradesh’s renewable energy capacity and support India’s broader clean energy transition goals. The Morena Solar Park is a key renewable energy initiative in the state and is designed to enhance grid stability through integrated storage solutions. The addition of BESS alongside solar generation will enable efficient peak power management and improved dispatch reliability.

Commenting on the development, Ramneek Sehgal, Chairman & Managing Director, Ceigall India Limited, said:

“We are pleased to secure the 220 MW Solar and BESS project at Morena Solar Park from Rewa Ultra Mega Solar Limited. As India progresses toward its 500 GW non-fossil capacity target, integrated solar and storage solutions are essential for delivering reliable, dispatchable renewable power. This project strengthens our presence in the clean energy segment, and we are committed to executing it efficiently while supporting India’s energy transition and decarbonisation objectives.”

This order further strengthens Ceigall India’s growing order book and marks a strategic expansion into large-scale renewable energy infrastructure. The project aligns with the Company’s long-term vision of participating in nation-building initiatives across transportation and energy infrastructure.

Tags: BESSCeigall IndiapowerRenewable Energysolar
ShareTweetShare
Palak

Palak

Related Posts

Sunsure Energy

Sunsure Energy secures Rs 2.62 billion financing for 75 MWp solar project in Tamil Nadu

by Palak
July 9, 2026
0

Sunsure Energy has secured Rs 2.62 billion debt financing from FMO, the Dutch entrepreneurial development bank, and Axis Bank for...

Solar and Wind

Hexa Climate signs 100 MW wind-solar hybrid PPA with CESC

by Palak
July 9, 2026
0

Hexa Climate has signed a power purchase agreement (PPA) with CESC Limited for the supply of 100 MW of inter-state...

Jupiter International Limited

Jupiter International Limited Secures ₹1.08 Billion Solar Pumps Order from Maharashtra State Electricity Distribution Company Limited

by Palak
July 9, 2026
0

Jupiter International Limited has received a Letter of Empanelment (LoE) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL). The...

Solar

Hartek Power Bags Order for 400 MW Solar Project in Rajasthan

by Palak
July 9, 2026
0

Hartek Power has secured a 400 MW utility-scale solar engineering, procurement, and construction (EPC) project in Rajasthan. The project will...

GK Energy

GK Energy Wins 10,000 Solar Pumps Order from MSEDCL

by Palak
July 7, 2026
0

GK Energy Limited has received a letter of empanelment (LoE) from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for 10,000...

Next Post
Sibanye-Stillwater

Sibanye-Stillwater Signs 10-Year Renewable Power PPA with Etana Energy

CAPE Holland

CAPE Holland Secures Pile Installation Tool Deal for Fengmiao Offshore Wind Farm

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Havells India Limited

Havells partners with Pixii AS to enter battery energy storage segment

July 13, 2026
SAEL

SAEL Industries Limited Bags Solar Module Supply Order from NTPC Renewable Energy Limited

July 13, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

Havells partners with Pixii AS to enter battery energy storage segment

SAEL Industries Limited Bags Solar Module Supply Order from NTPC Renewable Energy Limited

Power Grid Corporation of India Limited Secures LoI for ISTS Augmentation Project Under TBCB

Gujarat Urja Vikas Nigam Limited Announces Winners of 250 MW Wind Power Auction

AmpereHour Energy Launches Intelligent Energy Storage Manufacturing Platform, Bringing Digital-First BESS Integration to India

Made in India, Made for the World: India’s Wind Power Converter Manufacturing Reaches New Scale

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved