Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Akaysha Energy Secures A$650 Million in Funding for Orana BESS

editor by editor
July 17, 2024
in News
Reading Time: 1 min read
0
Akaysha Energy
Share on FacebookShare on TwitterShare on Linkedin

The Orana battery energy storage system (BESS) project in New South Wales, Australia, has reached an agreement for A$650 million with Akaysha Energy. Situated in the Central West Orana renewable energy zone, the Orana project will be built with funding from the three-year facility. The project is scheduled to be online in 2026 with a 1,660 MWh of projected capacity.

Eleven banks provided financing: BNP Paribas, Siemens Financial Services through Siemens Bank, the Canadian Imperial Bank of Commerce, and local banks ANZ, CBA, and Westpac. Akaysha has also received A$75 million in letters of credit to cover the project’s security commitments.

RELATED POSTS

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

Akaysha has more than 4 GWh of energy storage projects in Australia, with the Orana project now under construction. One of the project’s finance arrangements is a 12-year “virtual toll” offtake agreement for 200 MW of contractual capacity with EnergyAustralia. The Orana BESS will have CPP provide its balance of plants and be outfitted with Tesla Megapack technology.

ShareTweetShare
editor

editor

Related Posts

FPT TUVSUDV

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

by Urja Daily
June 23, 2026
0

FPT, the Iveco Group brand dedicated to the design, production, and sale of low-environmental impact powertrains, has obtained certification in...

Utkarsh Gupta

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

by Urja Daily
June 23, 2026
0

Satna, Madhya Pradesh: Gruner Renewable Energy, the flagship company of the Gruner Group and one of World's fastest-growing Technology + Engineering,...

VinFast India

VinFast India, Tata Capital Join Hands for Dealer Financing

by Palak
June 20, 2026
0

Gurugram, Haryana, India - VinFast Auto India, a subsidiary of the global EV brand VinFast, has signed a Memorandum of...

Amit sethi

Securing India’s Roads

by Palak
June 17, 2026
0

India's automotive sector is accelerating toward a connected, electrified future, with millions of vehicles now equipped with electronic control units...

Comau

Comau and Omron Robotics Target Electronics and Medical Manufacturing Automation

by Palak
June 17, 2026
0

COMAU and OMRON Robotics collaborate to accelerate advanced industrial automation across high-growth manufacturing sectorsPartnership combines complementary robotics, control, and software...

Next Post
Su-Kam

Su-Kam Sets INR 6000 Crore Revenue Target for the Next Five Years

Solar Panels in France

Carrefour and GreenYellow Partner to Install 350 MW of Solar Panels in France

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

FPT TUVSUDV

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

June 23, 2026
FPT

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

June 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0

FPT Enters The Top Three of Europe’s Certified High-Voltage Battery Producers With TÜV SÜD Recognition 

FPT And Green Power Systems Help Boost Algeria’s Powdered Milk Production

Gruner’s CBG Plant Sets Asia Record with 23.5 TPD Output, Achieves 120% of Design Capacity at Satna

Integrals Power Validates Sustainably Produced Iron Phosphate Precursor and LFP Cathode Material in Cell Level at University of St Andrews

Power Transmission is the Foundation of Economic Growth

VinFast India, Tata Capital Join Hands for Dealer Financing

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved