Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

ADB Approved Loan $27 Mn to Establish Kom Ombo Solar Power Plant : Egypt

Urja Daily by Urja Daily
March 8, 2021
in Solar
Reading Time: 2 mins read
0
solar power plants
Share on FacebookShare on TwitterShare on Linkedin

The African Development Bank’s Board of Directors has approved $27.2 million in loan financing for the design, construction and operation of a 200 MW photovoltaic solar power plant at Kom Ombo, in Upper Egypt on the river Nile.  

The project is expected to lower electricity costs for businesses and residences, as well as reducing greenhouse gas emissions and creating construction and other jobs.  

RELATED POSTS

TNB and IOI partner for 500 MW solar project in Malaysia

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

The project’s total cost is estimated at $156.4 million. In addition to the Bank’s financing, structured as a senior loan, the European Bank for Reconstruction and Development, the Green Climate Fund (GCF), Arab Bank and the OPEC Fund for International Development will contribute funding. The plant, 800 km south of Cairo, is owned by ACWA Power, a leading Saudi Arabian developer, investor and operator of power generation and desalinated-water plants worldwide.

“We are delighted to support this project that will deliver one of the lowest generation tariffs on the continent,” said Kevin Kariuki, the Bank’s Vice President for, Power, Energy, Climate and Green Growth. He added that “the project supports Egypt’s energy transition and contributes towards the country’s achievement of its targeted 20% share of renewables by 2022.”

Egypt’s economy has continued to grow during the COVID-19 pandemic, and its electricity demands are increasing at an average annual rate of 7%. By increasing Egypt’s installed power generation capacity from renewable sources, the plant is forecast to reduce greenhouse gas emissions more than 7 million tCO2e equivalent over a 25-year period. During the construction phase, 800 jobs will be created.

Egypt’s electricity grid is linked to those of neighbors Libya and Sudan, and the plant has the potential to greatly contribute to energy trading and electricity access in the region.

The project aligns with Egypt’s national Integrated Sustainable Energy Strategy and the Bank’s New Deal on Energy for Africa, which aims to increase the share of renewable energy through innovative financing in Africa’s energy sector. The project also advances the institution’s Light Up and Power Africa High-5 strategic priority. 

The Bank’s Deputy Director General for North Africa, Malinne Blomberg said that “the newly approved transaction is a continuation of the Bank’s long-standing partnership with the Government of Egypt and its strong support for the country’s reform agenda.” In addition to advancing the country’s green development, “the Kom Ombo project is also contributing to the sustainability of a sector that is essential for Egypt’s competitiveness and industrial development. More immediately, the recovery from COVID-19 will benefit from an efficient and sustainable energy sector,” she added.

Egypt is one of the founding members of the African Development Bank Group. Since starting lending operations in 1974, the Bank Group has financed over 100 operations in Egypt across several sectors.

Tags: ACWA PowerAfrican Development Bank GroupKom Ombophotovoltaic solar power plantsolar power plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Solar

TNB and IOI partner for 500 MW solar project in Malaysia

by Urja Daily
November 12, 2026
0

Tenaga Nasional Bhd (TNB) plans to invest up to RM424.4 million in a joint venture (JV) with IOI Corp Bhd...

Vikran Engineering

Vikran Engineering Posts 25% YoY Revenue Growth in Q2 FY27, Expands Solar EPC and Power T&D Presence

by Urja Daily
November 6, 2026
0

Thane : Vikran Engineering Limited, one of India's fast-growing EPC companies with a diversified presence across Power Transmission & Distribution,...

Bluebird Solar

Bluebird Solar Expands BESS Solutions Across Industries

by Urja Daily
November 4, 2026
0

Bluebird Solar Private Limited has announced its entry into the Battery Energy Storage System (BESS) segment with a new portfolio...

ACME Solar

ACME Solar signs PPA with NTPC for 400 MW FDRE project

by Urja Daily
November 2, 2026
0

ACME Marigold Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has signed a power purchase agreement...

Mr. Vinay Thadani - Director & CEO - GREW Solar

GREW Solar Receives ALMM List-II Approval for 2.4 GW N-Type TOPCon G12R Cell Manufacturing Capacity, Supporting India’s Solar Self-Reliance Vision

by Urja Daily
November 1, 2026
0

Mumbai / Ahmedabad : GREW Solar has received approval for the inclusion of its 2407 MW solar PV cell manufacturing capacity...

Next Post
Electric vehicle changing

Mobilising Electric Vehicle Financing in India

JMK Research India

India Module Shipment 2020: LONGi Bags Top Slot

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved