Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India

Urja Daily by Urja Daily
February 17, 2022
in News, Tenders
Reading Time: 2 mins read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Site visit & Pre-Bid meeting notification: Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Project: Innovation in Solar Power and Hybrid Technologies Project

Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India.

RFB No: SECI/C&P/OP/17/002/21-22

Tender Search Code (TSC) for the RfB: SECI-2022-TN000005

Date of Site Visit & Pre-Bid meeting:

The site visit for the subject tender has been scheduled on 03.03.2022, for which the SECI team along with Prospective bidders will start at 0930 Hours from Hotel Chanakya BNR, Ranchi to the site located at Getalsud Dam.

All prospective bidders are required to kindly coordinate with the Project In charge, Mr Pallav Yadu (Mob 9826087389, yadu.pallav@seci.co.in) in consultation with the Project Head, Mr Shreedhar Singh (shreedhar.singh@seci.co.in), so as to start on time from the Hotel. 

Post the site visit, the Pre-Bid meeting has been scheduled at Hotel Chanakya BNR itself on 04.03.2022 at 1100 Hours. The meeting will be conducted in both online & offline modes. The details of the online meeting are mentioned below :

please join the meeting at 04.03.2022, 11 AM Hours, India Standard Time (UTC+5:30), by clicking on this link:

Maximum 02 (Two) persons from the respective Bidder side are allowed to attend the Site visit & Pre-Bid Meeting.

Its mandatory to send across the details of the Bidder team members at umesh.patidar@seci.co.in & sandeeprana@seci.co.in, who wish to participate in the subject Site visit & Pre-Bid meeting, so as to arrange necessary formalities at SECI’s end. Mail confirmation along with the person details is to be sent latest by 02.03.2022.

Prospective Bidders are requested to remain updated for any notices wrt the Site visit, Pre Bid meeting & Bidding document through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued in this regard.

Tags: Floating Solarpre-bid meetingtender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

by Palak
July 31, 2026
0

Inox Wind Limited has secured a repeat 200 MW turnkey order from NLC India Limited. The order covers end-to-end project...

Next Post
ADS TEC Energy ultra high speed

200 Ultra-High-Speed ADS-TEC Energy EV Chargers in Florida

Lapp

LAPP India Partners with CAHORS

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved