Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India

Urja Daily by Urja Daily
February 17, 2022
in News, Tenders
Reading Time: 2 mins read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Site visit & Pre-Bid meeting notification: Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Project: Innovation in Solar Power and Hybrid Technologies Project

Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India.

RFB No: SECI/C&P/OP/17/002/21-22

Tender Search Code (TSC) for the RfB: SECI-2022-TN000005

Date of Site Visit & Pre-Bid meeting:

The site visit for the subject tender has been scheduled on 03.03.2022, for which the SECI team along with Prospective bidders will start at 0930 Hours from Hotel Chanakya BNR, Ranchi to the site located at Getalsud Dam.

All prospective bidders are required to kindly coordinate with the Project In charge, Mr Pallav Yadu (Mob 9826087389, yadu.pallav@seci.co.in) in consultation with the Project Head, Mr Shreedhar Singh (shreedhar.singh@seci.co.in), so as to start on time from the Hotel. 

Post the site visit, the Pre-Bid meeting has been scheduled at Hotel Chanakya BNR itself on 04.03.2022 at 1100 Hours. The meeting will be conducted in both online & offline modes. The details of the online meeting are mentioned below :

please join the meeting at 04.03.2022, 11 AM Hours, India Standard Time (UTC+5:30), by clicking on this link:

Maximum 02 (Two) persons from the respective Bidder side are allowed to attend the Site visit & Pre-Bid Meeting.

Its mandatory to send across the details of the Bidder team members at umesh.patidar@seci.co.in & sandeeprana@seci.co.in, who wish to participate in the subject Site visit & Pre-Bid meeting, so as to arrange necessary formalities at SECI’s end. Mail confirmation along with the person details is to be sent latest by 02.03.2022.

Prospective Bidders are requested to remain updated for any notices wrt the Site visit, Pre Bid meeting & Bidding document through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued in this regard.

Tags: Floating Solarpre-bid meetingtender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

BL Agro

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

by Urja Daily
October 23, 2026
0

New Delhi/Bareilly : BL Agro announced its entry into the global market with a strategic investment of ₹7000 crore in...

Solar wind

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

by Urja Daily
October 23, 2026
0

According to latest research by Growth Market Reports, the Transformerless Solar Central Inverter market size reached USD 4.1 billion in...

Yash Highvoltage

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

by Urja Daily
October 22, 2026
0

Vadodara : Yash Highvoltage Limited a leading manufacturer of condenser-graded high voltage and high current transformer bushings, has announced its unaudited...

Comau

Comau Partners with NVIDIA to Advance Physical AI in Industrial Robotics

by Urja Daily
October 21, 2026
0

Comau is integrating NVIDIA Physical AI simulation libraries and accelerated computing into its products and system design processes to accelerate...

EcoCortec

EcoCortec® Lab Earns Prestigious ISO/IEC 17025 Accreditation, Solidifying Global Trust in VpCI® Quality

by Urja Daily
October 21, 2026
0

EcoCortec has been granted HRN EN ISO/IEC 17025:2017 accreditation. Effective October 5th for a five-year period, the EcoCortec® Testing Laboratory...

Next Post
ADS TEC Energy ultra high speed

200 Ultra-High-Speed ADS-TEC Energy EV Chargers in Florida

Lapp

LAPP India Partners with CAHORS

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved