Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Sungrow Installed 130 MWp Bagerhat Solar Power Plant

Urja Daily by Urja Daily
December 20, 2021
in Solar
Reading Time: 3 mins read
0
Sungrow
Share on FacebookShare on TwitterShare on Linkedin

KHULNA, Bangladesh – Sungrow has announced recently that Bangladesh’s largest PV project – the 130 MWp Bagerhat solar power plant with Sungrow’s central inverter solutions installed came into commercial operation in late December 2021. Working closely with ABB and Orion Group, Sungrow will offer its expertise and continue to support Bangladesh in its energy transition journey.

With 95% of Bangladesh’s power generation stemming from gas, diesel, and coal, this 130 MWp project is a significant development for a nation that had a total grid-connected capacity of approximately 100 MW in 2020.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Located in Khulna, the Bagerhat project overtook the 73 MW Mymensingh solar power plant as Bangladesh’s largest solar power plant upon its completion. Utilizing Bangladesh’s 2,500 hours of sunshine per year, the project will be able to generate power equivalent to that produced by more than 324,000 tons of coal a year. It is so far the largest eco-friendly power project to provide clean energy by using the most efficient monocrystalline solar panels and over 99% efficient inverters. This plant is connected to 132/33 KV Mongla PGCB Grid Substation through a newly constructed around 9 km transmission line.

Due to Bangladesh’s humid and hot climate, ABB has chosen to deploy Sungrow’s advanced SG3125HV 1500Vdc system for its efficiency and cost-effectiveness. The SG3125HV features temperature-controlled air cooling which allows it to operate without derating even when the temperature is up to 50 degrees Celsius. Moreover, its design allows for investment savings in the form of lower transportation and installation costs.

The investor of this project, Orion Group is a leading conglomerate and a legendary brand name in the business arena of Bangladesh. “We needed a solution that offers the most upside in terms of performance, cost-effectiveness, and compatibility with the conditions of the project. Sungrow, as a pioneer, was able to surpass all of our expectations with their state-of-the-art product,” commented Mehedi Islam Aneek, Project Manager of Orion Group.

Recently, the government of Bangladesh unveiled its renewable energy generation strategy for the Eighth Five-Year Plan period. The government said the new strategy will have to be aggressively pursued so that all that is planned to get implemented in time and the required policy support is prioritized. Citing the significant success of the introduction of rooftop PV systems and the role solar energy has played in providing lighting for homes, the Bangladeshi government said that the Eighth Five-Year Plan will continue to focus on solar and wind power development.

“We are honored and excited to be a part of the first 130 MWp scale solar project in Bangladesh. Bangladesh’s rapid industrialization has led to a drastic demand increase for power generation and the government is more focused on renewable energy development than ever before. With our experience and expertise, Sungrow is ready to expand our footprint in this growing market and assist Bangladesh in reaching its renewable power generation targets and beyond,” said Hu Yukun, Regional Manager, South Asia of Sungrow.

For more information, please visit www.sungrowpower.com.

Tags: inverter solutionPGCB GridSolar Panelssolar power plantSungrow
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
WAAREE Energies

WAAREE Supplied 2.4 MW of Solar Modules to Kochi Metro Rail

Eco Innovation Group

Eco Innovation Group Files Patent Application for PoolCooled

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved